8 IC183

 

 

Bearings 

Ball bearings are despatched from the works fully charged with grease. 
 
Shielded bearings have sufficient grease for an operating life of at least two years in normal ambient conditions, 
providing there is little or no grease leakage. 
 
Bearings will eventually need replacing. 

 

 

Maintenance

 

When carrying out any maintenance and inspections always follow the health and safety guidelines on page 4. A 
regular correct maintenance plan is essential to good operational reliability and a long service life for your machine. 
As operating conditions vary, no exact timings can be specified for wear checks, repairs and inspections, however 
the following plan can be used as a guide until time scales to better suit the machines environment are found. 
Install all protective devices and controls properly after completion of work. Dispose of any cleaning solutions as 
prescribed by law. Fully trained and competent staff must carry out any maintenance work. Utile  
Engineering offer contract maintenance services if required contact our service department. 
 
The machine, ancillaries and surrounding area should be kept as clean as possible. 
 
Ensure all items are properly held and supported during all aspects of maintenance as not to pose a problem for 
health and safety. Observe all lifting points and apply care when handling the equipment. 
 
Ensure all machines and associated pipework have cooled down sufficiently before touching and attempting any 
maintenance. 
 
After any maintenance the machine and equipment must be treated as new and all pre-commissioning checks 
should be made. Ensure all guards are secure and in place. 

Bearings 
Maintenance 

MAINTENANCE PLAN

 

DAILY CHECKS 

 

QUARTERLY CHECKS 

TASK CHECK 

 TASK CHECK 

Clean inlet filters (Daily for 1

st

 week). 

 

  Check machine for blade wear. 

 

Check Belt condition/Tension (Hourly for 
running in period). 

 

  Check control panel for wiring, cleanliness and 

function of all panel features. (if applicable) 

 

Drain all vessels, condensate traps, outlet 
filters manually 

 

  Check function of emergency stop button and 

local motor isolator. (if applicable) 

 

 

 

  Check motors for excessive vibration and 

damage. 

 

 

 

  Check function of vacuum gauges. 

 

WEEKLY CHECKS 

  Check function of non-return valves 

 

Check belt condition / tension 

 

  Check function of vacuum relief valves 

 

Clean inlet filters (After for 1

st

 week). 

 

   

 

Run Standby machine for a few minutes. 

 

   

 

Clean vacuum line filters 

 

   

 

 

 

   

 

 

 

 

YEARLY CHECKS 

MONTHLY CHECKS 

   

 

Check function and operation of all valves. 

 

  Check flanges and joints for leaks. 

 

Check differential pressure across filters (clean 
and replace if necessary). 

 

  Clean internally vessels, condensate traps, 

filters (including elements). 

 

Check function and operation of autodrains / 
condensate lines. 

 

  Inspect machine internally (at least once a 

year) 

 

Clean fins on machine and motors 

 

   

 

  

 

   

 

Содержание DSP25-5

Страница 1: ...o Ltd 15 08 06 Irthlingborough Northamptonshire England Tel 44 0 1933 650216 Fax 44 0 1933 652738 1 IC183 Installation Operation Maintenance Instructions Model DSP25 5 Vacuum Pump Serial Number Site Location Installation Date ...

Страница 2: ...as been incorporated and the said equipment declared to be in conformity with the Machinery Directive they must not be put into service Foreword The SP series rotary vacuum pump has been developed based on many years of experience in the compressor and vacuum pump industry Using modern design techniques and production methods coupled with rigorous testing and high quality standards ensure this ser...

Страница 3: ...cement principle They provide a constant low pulsation supply of air or gas The machines have a cylindrical bored housing The rotor which is also cylindrical is fitted eccentrically in the cylinder so that a crescent shaped working chamber is formed Movable rotor vanes are fitted in the longitudinal grooves in the rotor centrifugal force and the force of the air or gas presses the blades against t...

Страница 4: ...stored accidentally during the maintenance or service period Safety trips overspeed trips emergency stop buttons and other such devices are to be checked regularly to ensure that they continue to function correctly and will protect the installation and personnel in the event of an emergency NO attempt should be made to touch the machine whilst it is rotating Particular care is needed when checking...

Страница 5: ...e recommend that until the machine is installed the shaft be turned a few revolutions by hand every month to ensure the machine is running free The green protective coating on the shaft remains effective for approximately 1 year If the machine is stored for a longer period of time the coat must be renewed Handling Skilled personnel working in accordance with safe working practices must carry out t...

Страница 6: ...in threaded holes Mount assembly in desired position on shafts 3 Tighten setscrews Place disc flexible coupling in position and bring the shafts together obtaining the manufacturers assembled length for the coupling given in their instructions 4 To check for angular alignment see fig 5 Rotate the coupling through 90 and measure the distance between the faces Repeat adjusting the shafts until four ...

Страница 7: ...rection of rotation agrees with the arrow on top of the machine cylinder Note this should be completed with the coupling drive belts removed 9 Recheck coupling drive alignment and retension 9 Check that the machine is free running by turning the shaft by hand through a few revolutions 9 Check all piping connections 9 Check all protective devices ensuring they are working correctly 9 Flick start th...

Страница 8: ...s not to pose a problem for health and safety Observe all lifting points and apply care when handling the equipment Ensure all machines and associated pipework have cooled down sufficiently before touching and attempting any maintenance After any maintenance the machine and equipment must be treated as new and all pre commissioning checks should be made Ensure all guards are secure and in place Be...

Страница 9: ...3 Erratic cylinder wear 3 Rebore redowel check lubrication 4 Rotor contacting coverplates 4 Check temperature pressure internal clearances 5 Drive misalignment 5 Realign and retension drive 6 Warped rotor blades 6 Replace rotor blades Abnormal noise vibration or periodic knocking 7 Excessive liquid carryover 7 Drain all points 1 Worn blades 1 Replace rotor blades 2 Improper belt tension 2 Adjust b...

Страница 10: ...t strongly to contact Utile Engineering Service Department for advice 2 Reassembly after Blade Inspection Reassemble in the reverse order taking note of the following points 2 1 Ensure the blades 6 are orientated correctly in their slots 2 2 Fit o ring 10 into groove in cylinder 1 end face 2 3 Replace coverplate and screws 3 Cylinder Renewal With the rear end coverplate 3 already removed as descri...

Страница 11: ... dowels and bolt with 4 screws 12 and with o ring 10 in place 5 7 Check rotor cylinder clearance Reassemble drive end 5 8 Refit sliding blades 6 in their slots removing any high spots with fine emery cloth Ensure the blades are orientated correctly in their slots 5 9 Fit spacing ring 5 onto the shaft refit the PTFE ring 14 5 10 Press ball bearing 7 onto the shaft 5 11 Replace shaft seal 8 in cover...

Страница 12: ... 1000 4 12 SOCKET HEAD CAP SCREW G 1014 8 13 SHIM K 1005 TO SUIT 14 PTFE RING SK 2536 2 15 BALLAST ADAPTOR S 10299 1 16 SINTERED FILTER L 1238 2 17 KEY N 1036 1 After Sales Service Contact the address or telephone number shown at the bottom of each page or our local distributor for any after sales service maintenance or service problems Contract maintenance service exchange machines or a site visi...