![UTICA BOILERS UCS-380 Скачать руководство пользователя страница 96](http://html.mh-extra.com/html/utica-boilers/ucs-380/ucs-380_installation-operation-and-maintenance-manual_1065219096.webp)
P/N 240011775 Rev. A [02/02/17]
HEAT EXCHANGER CLEANING INSTRUCTIONS
DMG/UCS - 240, 380
FOR UCS & DMG 240/380 BOILERS
WARNING
Fire, explosion, asphyxiation and electrical shock
hazard. Improper installation could result in death or
serious injury. Read this instruction and understand all
requirements, including requirements of authority having
jurisdiction, before beginning installation. Installation
not complete until appliance operation verified per
Installation, Operation & Maintenance Manual provided
with boiler.
!
Kit installation shall be completed by qualified agency.
1.
Follow instructions TO TURN OFF GAS TO APPLIANCE found
on Operating Instructions label on boiler or in Installation,
Operation & Maintenance Manual. Verify all electrical power
to boiler is turned off.
WARNING
Electrical shock hazard. Turn OFF electrical power supply
at service panel.
!
2.
Turn power and gas off to the boiler.
3.
Remove screws from front of jacket cover. Lift jacket off
Boiler.
WARNING
Burn hazard. Verify heat exchanger, igniter, and flame
sensor have Burn, Scald hazard. Turn Off water to boiler
Verify unit has cooled before servicing. Use appropriate
personal protection equipment.
!
4.
Inspect combustion chamber through sight glass. Verify
flame is not present. See Figures 1 and 2.
5.
Allow Boiler to cool.
6.
Press tabs and place control panel in down position. See
Figure 3.
7.
380 - remove four (4) screws securing control support
bracket. Place control securely aside, within boiler cabinet.
See Figure 4.
8.
Disconnect hose to top of condensate trap drain inside
boiler. Place a recepticle (ie: cup, bucket) under hose to
collect debris and cleaning fluid. See Figure 5.
CAUTION
Laceration, burn hazard. Metal edges and parts may
have sharp edges and/or may be hot. Use appropriate
personal protection equipment to include safety glasses
and gloves when installing or servicing this boiler. Failure
to follow these instructions could result in minor or
moderate injury.
!
WARNING
Combustion chamber insulation in this product
contains ceramic fiber material. Ceramic fibers can
be converted to cristobalite in very high temperature
applications. The International Agency for Research
on Cancer (IARC) has concluded, Crystalline silica
inhaled in the form of quartz or cristobalite from
occupational sources is carcinogenic to humans
(Group1). Avoid breathing dust and contact with
skin and eyes. Use NIOSH certified dust respirator
(N95). This type of respirator is based on the OSHA
requirements for cristobalite at the time this document
was written. Other types of respirators may be
needed depending on the job site conditions. Current
NIOSH recommendations can be found on the NIOSH
website athttp://www.cdc.gov/niosh/homepage.html.
NIOSH approved respirators, manufacturers, and
phone numbers are also listed on this website. Wear
long-sleeved, loose fitting clothing, gloves, and eye
protection. Apply enough water to the combustion
chamber lining to prevent dust. Wash potentially
contaminated clothes separately from other clothing.
Rinse clothes washer thoroughly.
NIOSH stated First Aid. Eye: Irrigate immediately.
Breathing: Fresh air.
!
Ignition Flame
Detection Electrode
Spark Generator
Sight Glass
Figure 1 - 240 Heat Exchanger - Front of Boiler
Heat Exchanger 240
Auxiliary Control Box
Control
Illustrations are a depiction of boiler for general location of parts and are subject to
change without notice.
Содержание UCS-380
Страница 1: ...UCS 380 CONDENSING GAS FIRED BOILER ...
Страница 50: ...48 8 ELECTRICAL CONNECTIONS FIGURE 8 16 Wiring Diagram PN 240011662 Rev K 01 31 2020 ...
Страница 91: ......