![USC LPV Series Скачать руководство пользователя страница 44](http://html.mh-extra.com/html/usc/lpv-series/lpv-series_operators-manual_1064064044.webp)
Page 44
LPV SEED TREATER
FINAL
1.
Disconnect power to the machine.
2.
Store the machine inside a protective building to keep it from being exposed to the
weather.
3.
Ensure all guards and safety labels are in place.
ROTATING DRUM
1.
Remove the shields and clean out any seed that may have fallen underneath the
drum.
2.
Clean out any residue left on the inside of the drum and around the seed lifters.
3.
Lubricate the chain to keep from corroding in storage.
ATOMIZER CHAMBER
1.
Remove and clean the atomizer
housing.
2.
Remove the atomizer head and
stainless steel plumbing. The
atomizer head may be disassembled
(right), for easier cleaning.
It is threaded together and can simply
be unscrewed.
3.
Reinstall the atomizer head and
plumbing. Grease the bearing and
spin the atomizer head a few times
to ensure all grease has been worked
into the bearings.
Содержание LPV Series
Страница 14: ...Page 14 LPV SEED TREATER Part 09 02 0001 Part 09 02 0002 ...
Страница 15: ...Page 15 LPV SEED TREATER Part 09 02 0002 Part 09 02 0001 ...
Страница 45: ...Page 45 LPV SEED TREATER NOTES ...