Page 22
LPV SEED TREATER
1.
Connect a cable with four pin connector to one of the three Powerlink connectors
on the MCP. Connect the other end to the Powerlink connector on the closest con-
trol panel. Repeat this process until all control panels are connected. It may be
MCP to Treater to Tri
-
Flo® to Bin Site panel. The order or number of devices is
not important. It is important that all panel are connected. All pump stand control
panels will need to connected in a similar configuration.
2.
If you have manual or semi
-
automated pump stands connect the 2 pin communica-
tion cables from pump stands to one of the auxiliary ports on the treater control
panel.
3.
LOSS
-
IN WEIGHT: Connected to the load cell summing box on the scale.
4.
LOSS
-
IN
-
WEIGHT: Connected to the cable at the top of the remote I/O block to
PJ2454
5.
LOSS
-
IN
-
WEIGHT Connected to the power cable at the bottom of the Remote I/O
Block to PJ2701
VERSION 4 LPV TREATER CONNECTIONS
(Except 575v / 3ph)
1
4
6
17
16
9
7
12
15
14
13
8
3
10
5
11
2
Содержание LPV Series
Страница 14: ...Page 14 LPV SEED TREATER Part 09 02 0001 Part 09 02 0002 ...
Страница 15: ...Page 15 LPV SEED TREATER Part 09 02 0002 Part 09 02 0001 ...
Страница 45: ...Page 45 LPV SEED TREATER NOTES ...