-6
-
6”
Dimensions from Hinge Pivot Point
Gate Open Direction
STEP 1 Hinge Mount Tube Installation (Part 1)
PULL TO OPEN / TOP VIEW
(SEE BOTTOM OF PAGE FOR PUSH TO OPEN)
(Left-handed installation shown. Reverse for right-handed installation)
STEP 1
Hinge Mount Tube Installation (Part 2)
PUSH TO OPEN / TOP VIEW
(SEE TOP OF PAGE FOR PULL TO OPEN)
(Left-handed installation shown. Reverse for right-handed installation)
Regardless of method used, the hinge mount tube should be very secure since the entire force of the gate is directed to this
mount. The post must be of adequate strength to resist twisting as well.
Conform to dimensions shown at top of page in all cases. See page 7 to locate height of hinge mount tube on post.
Note: USAutomatic is not responsible for failure to comply with UL325 standards, local
building codes or improper installations.
Optional masonry column
Concrete fill recommended.
Dimensions from hinge pivot point
Steel post 4 inch
GATE
minimum
diameter
¼ inch thick wall min.
8 inches
6
inches
Hinge Mount Tube
Gate Open Direction
(cut as necessary to achieve
dimensions
shown)
Figure
1A
8”
Other Typical Methods for
Pull to Open Applications
Push to Open Applications
Wood post add metal plate and
bolt on with ½ inch carriage
bolt/washers/nuts.
Thin
wall
Round Post
post add
Hinge mount tube
saddle cut
support
must be level
Level
tube for fit
prevent
In all directions for proper
twisting.
alignment and operation.
Figure 1B
Hinge Mount Tube (Cut as necessary to
Achieve dimensions shown)
Steel Post
4” minimum
diameter
¼” min. wall
diameter
Figure 1C
Содержание STAR I
Страница 2: ......