- 9 -
Steps are as follows:
●Remove top panel, and needle type pressure joint screw arbor (Fig.1), then slip
rubber tube of pressure gauge over needle type pressure joint;
●Start the equipment in accordance with the instructions, measuring gas supply
pressure (dynamic pressure) in the work state;
●Access to the equipment if measured data within the limits of Table 1, otherwise,
you will need to adjust gas pressure regulating valve or contact gas supplier to
bargain;
●Unplug pressure gauge after you accomplish
Pressure testing, then install needle type pressure joint screw arbor.
*
Important: must screw joint screw arbor, to prevent gas escape!
Fig. 1
Debugging
It’s very important to debug the new stove. Through the comprehensive system test
of equipment, we can ensure function and safety performance of our products.
Discovering any potential problems before use (such as equipment’s placement,
ventilation, operation, etc.), can avoid costly losses.
Содержание USFH-12-2
Страница 5: ... 4 Parameter Specifications Outline Dimensions in USFH 12 2 USFH 24 4 ...
Страница 6: ... 5 USFH 36 6 ...