28
TEST RUN
Once the assembly is complete, test run your
machine to make sure it runs properly and is
ready for regular operation. The test run con-
sists of verifying the following:
1. The motor powers up and runs correctly and
2. The stop button safety feature works cor-
rectly.
If, during the test run, you cannot easily locate
the source of an unusual noise or vibration,
stop using the machine immediately, then re-
view troubleshooting section.
WARNING: Before starting the planer, make
sure you have performed the preceding assem-
bly and adjustment instructions, and you have
read through the rest of the manual and are
familiar with the various functions and safety
features on this machine. Failure to follow this
warning could result in serious personal injury
or even death!
TO TEST RUN THE MACHINE:
1. Make sure you understand the safety in-
structions at the beginning of the manual and
that the machine is set up properly.
2. Make sure all tools and objects used during
set up are cleared away from the machine.
3. Make sure the gearbox has the correct
amount of oil (refer to Gearbox Oil for detailed
instructions).
4. Push the OFF button in, then twist it clock-
wise so it pops out. When the OFF button pops
out, the switch is reset and ready for operation.
5. Verify that the machine is operating correct-
ly by pushing the ON button.
—When operating correctly, the machine runs
smoothly with little or no vibration or rubbing
noises.
— Investigate and correct strange or unusual
noises or vibrations before operating the ma-
chine further. Always disconnect the machine
from power when investigating or correcting
potential problems.
6. Press the OFF button to stop the machine.
7. WITHOUT resetting the switch, press the ON
button. The machine should not start.
—If the machine does not start, the OFF but-
ton safety feature is working correctly. The Test
Run is complete.
—If the machine does start (with the OFF but-
ton pushed in), immediately disconnect power
to the machine. The OFF button safety feature
is not working correctly. This safety feature
must work properly before proceeding with
regular operations. Call Tech Support for help.
RE-TENSION V-BELTS
The final step of the setup process must be
done after approximately 16 hours of opera-
tion. During this period, the V-belts will stretch
and seat into the pulley grooves and need to
be properly tensioned to avoid severely reduc-
ing the life of the V-belts. Refer to V-Belts for
detailed instructions.
RECOMMENDED ADJUSTMENTS
For your convenience, the adjustments listed
below have been performed at the factory.
However, because of the many variables in-
volved with shipping, we recommend that you
at least verify the following adjustments to
ensure the best possible results from your new
machine.
Step-by-step instructions for these adjustments
can be found in the SERVICE section.
Factory adjustments that should be verified:
• Table height chain tension.
• Chip breaker height.
• Pressure bar height.
• Infeed/outfeed roller height.
• Roller spring tension.
• Chip deflector positioning.
OPERATION INSTRUCTIONS
OPERATION OVERVIEW
To complete a typical operation, the operator
does the following:
1. Examines the workpiece to make sure it is
acceptable for planing.
2. Puts on safety glasses or a face shield, a res-
pirator, and ear protection.
3. If necessary, uses a jointer to make one sur-
face of the workpiece flat.
4. Correctly adjusts the worktable height for
the operation.
5. If the workpiece is longer than can be sup-
ported by the planer table, arranges for as-
sistance or roller accessories to support the
workpiece.
6. When all safety precautions have been tak-
en, turns the planer ON, then sets the correct
feed rate for the operation.