Uponor KaMo Combi Port E Скачать руководство пользователя страница 1

Combi Port E

EN

Installation and operation manual

CD0000289

Содержание KaMo Combi Port E

Страница 1: ...Combi Port E EN Installation and operation manual CD0000289...

Страница 2: ...6 Electrical installation 17 6 1 Connecting the heat interface unit 17 7 Additional installation 18 7 1 Heat meter or cold warm water meter 18 7 2 Strainer 19 7 3 Filling flushing and venting 19 7 4 T...

Страница 3: ...products approved or specified by Uponor is not connected to or used with non Uponor products parts or components except for those approved or specified by Uponor and does not show evidence of tamper...

Страница 4: ...able vapours or gases Uponor cannot accept any responsibility for damage or breakdown that can result from ignoring these instructions 2 2 Standards and regulations Note The installation must be carri...

Страница 5: ...for details of where and how they can take this item for environmentally safe recycling Business users should contact their supplier and check the terms and conditions of the purchase contract This p...

Страница 6: ...aration between heating and tap water side secures that no heating of the cold water pipes takes place Domestic hot water The domestic hot water is generated only on demand with an integrated controll...

Страница 7: ...er RTB or differential pressure regulator G Strainer H Venting screw I Pump J Bypass valve K Heat meter distance piece L Draining and filling valve M Connection swivel nut Connection description CD000...

Страница 8: ...e Base Pulse Base PRO Autobalancing Cooling function Modularity Installation and configuration functions Wave Pulse Base Pulse Base PRO Installation wizard Offline configuration Over the air updates T...

Страница 9: ...Item Description A Differential pressure regulator B Return temperature limiter RTB Differential pressure regulator or return temperature limiter RTB can be connected on demand Tap water circulation C...

Страница 10: ...port or installation Check the nuts to ensure that they are properly tightened before the connection to avoid property damages Before installing Combi Port E ensure that the primary pipes are laid in...

Страница 11: ...parations SI0000295 A B C Item Description A Cabinet body B Frame C Door 1 Dismount the frame and door 2 Store the frame and door for later mounting Adjusting the in wall cabinet The in wall cabinets...

Страница 12: ...the enclosed plugs in the drilled holes and place the in wall box in the wall aperture SI0000305 A Item Description A Plug 4 pcs 4 Secure the in wall mounting box to the wall aperture and secure with...

Страница 13: ...m Description A Flat gasket Note Check the flat gasket for damage 4 Tighten the swivel nuts Connecting the pipes Note Install the pipes in accordance with planning documentation Note Ensure the use of...

Страница 14: ...lt 6 pcs 1 Mark the hole positions on the wall and drill holes using a 6 mm drill 2 Insert the plug in the drilled holes Note See the dimensional drawings for measurements Pay attention to the horizon...

Страница 15: ...Item Description A Circulation line B Room temperature control C Heating circuit secondary 2nd D Return temperature sensor E Differential pressure regulator Install the circulation line SI0000302 1 Co...

Страница 16: ...itional information Note Visit the download centre for more information regarding the configuration of Uponor Smatrix and Uponor Base flexiboard Install the heating circuit secondary Note Please read...

Страница 17: ...to Combi Port E in accordance with the wiring diagram see Wiring diagrams Page 30 2 Pull the battery protection foil on the right hand side of the heating station controller 3 Option Connect the BUS o...

Страница 18: ...s recorded by adding a heat meter with a fast scanning frequency that fully measures the volume flow rate every 3 4 seconds including kWh calculation Sensor pocket heat meter The sensor pocket M10x1 i...

Страница 19: ...ccording to the applicable guidelines 2 Fix any leaks immediately 7 5 Visual inspection Caution Improper commissioning can lead to property damage Note If an installation error is found during visual...

Страница 20: ...valve on site at a suitable central point to fill the central heating system Hydraulic scheme Observe the hydraulic diagram as an installation guide M M C D E G K L M N B A A WD0000032 I F H G M J Ite...

Страница 21: ...ating constant pressure Step 4 2 x 1 4 3 x 2 4 4 x 3 Pump effect EEI 0 20 Part 3 Value Speed P1 W Min 2 Max 33 Pump operation Display view Operation settings 0 P1 25 25 P1 50 50 P1 75 75 P1 100 Pump a...

Страница 22: ...F SI0000301 1 Download the Combi Port E app It is available both for iOS and Android mobile devices 2 Scan the QR code available on the Combi Port E controller 3 Press the blue button in the middle of...

Страница 23: ...cation returns to the foreground Polling interval Interval in seconds in which displayed values are updated Increase value to consume less battery charge Changes are applied when reconnecting 1 s Lang...

Страница 24: ...er OFF Room controller POSSIBLE SETTINGS Operating mode Control mode Time program Heating curve optional ECO mode heating DISPLAYED VALUES Supply secondary Return secondary Outdoor temperature optiona...

Страница 25: ...line The heat interface unit is equipped with a central shut off ball valve for cold water B As an option there is a shut off ball valve for installation purposes All ball valves should be exercised...

Страница 26: ...he display Hotwater Check the controller setting Check setpoints via the App in the display Hot water Waiting time for hot water is too long Check the pump setting in the central heating system Pump s...

Страница 27: ...ral heating circuit pump not working Check that the central heating circuit pump is working and correctly set Central strainer is dirty Clean the central strainer Heating system is not working correct...

Страница 28: ...0 W Contacts Description Marking L2 X3 Phase Black Brown Circulation pump N Neutral Blue Circulation pump PE Protective conductor Green Yellow Circulation pump L3 X4 Phase Black Brown Heating pump 1 N...

Страница 29: ...Modbus terminal 11 3 Data output Current measured values controller status and output states can be read and value settings changed in an external device e g computer RS485 interface 4 pin terminal X...

Страница 30: ...6 M 7 BU BN N L 3 1 2 4 5 6 M 8 BU BN N L 3 1 2 4 5 6 M 9 BU BN N L 3 1 2 4 5 6 M 10 BU BN N L 3 1 2 4 5 6 M 11 BU BN N L 3 1 2 4 5 6 M 12 BU BN N L 3 1 2 4 5 6 RTA N L L 1 RTA N L L 2 RTA N L L 3 RT...

Страница 31: ...PP cover W Uponor Base flexiboard controller X Zone valve for limiting heating flow to apartment Y Potential free heat circuit distributor cable optional Description of connection symbols For descript...

Страница 32: ...L G M R H H B W R R R T Q I O J R N O Q A V A T2 R Fuse T3 15A M 7 BN BU M 8 BN BU M 9 BN BU M 10 BN BU M 11 BN BU M 1 BN BU M 2 BN BU M 3 BN BU M 4 BN BU M 5 BN BU M 6 BN BU 12 L L PUMP L N BOILER 2...

Страница 33: ...ss V EPP cover W Uponor Smatrix Wave Pulse room controller X Zone valve for limiting heating flow to apartment Y Potential free heat circuit distributor cable optional Description of connection symbol...

Страница 34: ...M R H H B W R R R T Q I O J R N O Q A V A T2 R Fuse T3 15A M 7 BN BU M 8 BN BU M 9 BN BU M 10 BN BU M 11 BN BU M 1 BN BU M 2 BN BU M 3 BN BU M 4 BN BU M 5 BN BU M 6 BN BU 12 L L PUMP L N BOILER 24 V L...

Страница 35: ...ss V EPP cover W Uponor Smatrix Base Pulse room controller X Zone valve for limiting heating flow to apartment Y Potential free heat circuit distributor cable optional Description of connection symbol...

Страница 36: ...ainer H Venting screw I Pump J Bypass valve K Heat meter distance piece L Draining and filling valve M Connection ball valve N Circulation pump optional O Backflow preventer P Insert strainer Q Flow s...

Страница 37: ...2 h4 w w 1 l b b b1 h3 h4 h4 ZD0000018 l w w1 h2 h3 h4 b b1 560 648 630 132 140 40 60 180 In wall cabinet 750 x 850 w w 1 l h1 ZD0000015 l1 w 3 h w 2 l l1 w w1 w2 w3 h h1 795 750 901 5 850 849 5 22 85...

Страница 38: ...ixtures must be included Domestic hot water side secondary DI0000098 1 00 0 40 0 50 0 60 0 70 0 80 0 90 0 30 0 20 0 10 0 00 2 0 4 0 6 0 8 0 10 0 A B 12 0 14 0 16 0 18 0 20 0 22 0 C Item Description A...

Страница 39: ...ating supply temperatures C Tapping capacity in litres minute l min D Max range Tapping capacity DI0000102 40 35 30 25 20 15 10 5 0 2 4 6 8 10 12 14 16 18 20 22 A B 55 C 60 C 65 C 70 C 75 C 80 C 85 C...

Страница 40: ...l min D Max range Tapping capacity DI0000106 40 35 30 25 20 15 10 5 0 2 4 6 8 10 12 14 16 18 20 22 A B 65 C 70 C 75 C 80 C 85 C Item Description A Return temperature C B Tapping capacity in litres min...

Страница 41: ...C 50 C 60 C 70 C 75 C 80 C 85 C Item Description A Primary heating demand in litres hour l h B Primary heating supply temperatures C Tapping capacity in litres minute l min D Max range Tapping capaci...

Страница 42: ...ating supply temperatures C Tapping capacity in litres minute l min D Max range Tapping capacity DI0000114 40 35 30 25 20 15 10 5 0 18 2 4 6 8 10 12 14 16 20 22 24 A B 60 C 65 C 70 C 75 C 80 C 85 C It...

Страница 43: ...0116 40 35 30 25 20 15 10 5 0 18 2 4 6 8 10 12 14 16 20 22 24 A B 65 C 70 C 75 C 80 C 85 C Item Description A Return temperature C B Tapping capacity in litres minute l min Combi Port E Installation a...

Страница 44: ...to make changes without prior notification to the specification of incorporated components in line with its policy of continuous improvement and development www uponor com 1096053 v1_01_2020 Producti...

Отзывы: