procedures  shall  be  used.  However,  it  is  important  that  best  practice  is  followed  since  flammability  is  a 
consideration. The following procedure shall be adhered to:   

• Remove refrigerant;

• Purge the circuit with inert gas;

• Evacuate;

• Purge again with inert gas;

• Open the circuit by cutting or brazing.

The refrigerant charge shall be recovered into the correct recovery cylinders. The system shall be “flushed” 
with OFN to render the unit safe. This process may need to be repeated several times. Compressed air or 
oxygen shall not be used for this task.      Flushing shall be achieved by breaking the vacuum in the system 
with  OFN  and  continuing  to fill  until the  working  pressure  is  achieved, then venting  to  atmosphere,  and 
finally pulling down to a vacuum. This process shall be repeated until no refrigerant is within the system. 
When the final OFN charge is used, the system shall be vented down to atmospheric pressure to enable 
work to take place. This operation is absolutely vital if brazing operations on the pipe-work are to take place. 

Ensure  that  the  outlet for the vacuum  pump is  not  close  to  any  ignition  sources  and  there is ventilation 
available. 

8. Charging procedures

In addition to conventional charging procedures, the following requirements shall be followed. 

– Ensure that contamination of different refrigerants does not occur when using charging equipment. Hoses
or lines shall be as short as possible to minimise the amount of refrigerant contained in them. 
– Cylinders shall be kept upright.
– Ensure that the refrigeration system is earthed prior to charging the system with refrigerant.
– Label the system when charging is complete (if not already).
– Extreme care shall be taken not to overfill the refrigeration system.
Prior to recharging the system it shall be pressure tested with OFN. The system shall be leak tested on 
completion of charging but prior to commissioning. A follow up leak test shall be carried out prior to leaving 
the site. 

9. Decommissioning

Before  carrying  out  this  procedure,  it  is  essential  that  the  technician  is  completely  familiar  with  the 
equipment and all its detail. It is recommended good practice that all refrigerants are recovered safely. Prior 
to the task being carried out, an oil and refrigerant sample shall be taken in case analysis is required prior to 
re-use  of  reclaimed  refrigerant.  It  is  essential  that  electrical  power  is  available  before  the  task  is 
commenced.     

a) Become familiar with the equipment and its operation.
b) Isolate system electrically.
c) Before attempting the procedure ensure that:
• Mechanical    handling    equipment    is    available,    if    required,    for    handling    refrigerant cylinders;
• All personal protective equipment is available and being used correctly;
• The recovery process is supervised at all times by a competent person;
• Recovery equipment and cylinders conform to the appropriate standards.

Содержание UPC-8029

Страница 1: ...INSTRUCTIONS MANUAL UPC 8029 LOCAL AIR CONDITIONER Read and save these instructions for future reference...

Страница 2: ...Adjustment IV Control Setting V Drainage Instructions VI Maintenance VII Troubleshooting VIII Appendix Please read these instructions before use and repair The drawings provided in this manual may no...

Страница 3: ...in the use of flammable refrigerants 12 All working procedure that affects safety means shall only be carried by competent persons Notes The air conditioning is only suitable for indoor use and is not...

Страница 4: ...nd understand the hazards involved Children shall not play with the appliance Cleaning and maintenance shall not be made by children without supervision If the supply cord is damaged it must be replac...

Страница 5: ...e control panel beautiful and fashionable with high quality remote control It adopts a user friendly remote control design Air filtration capability Timing switch function Protection function of autom...

Страница 6: ...ht position and the air conditioning should be placed on a flat surface Do not install and use the air conditioning in the bathroom or other humid environments 1 1 Install the heat pipe assembly as sh...

Страница 7: ...mponents of the assembly 1 2 Install the window sealing plate assembly 1 3 Install the body 1 Move the machine with installed heat pipe and fittings before the window and the distance between the body...

Страница 8: ...Up Key 3 Down Key 4 Display Window 5 Fan Speed Selection Key 6 Mode Selection Key 7 Power Key When the machine is powered on for the first time the buzzer will play power on music and then the machine...

Страница 9: ...timing in the case of power off press the key to open timing Press the key when the timing symbol flashes press up and down key to select the required timing value Timing values can be set in 1 24 hou...

Страница 10: ...t to sewer or other drainage area to empty the water details see Drainage Instructions at the end of this chapter After the water is emptied the machine will automatically return to the original state...

Страница 11: ...water plug and tighten the drainage cover Notes 1 Restart the machine after the water plug and drainage cover are installed otherwise condensate water of the machine will flow to the floor or the car...

Страница 12: ...ing to remove the EVA filter screen as shown in the above figure 2 Put the EVA filter screen into warm water with neutral detergent about 40 104 and dry it in the shade after rinsing clean Unit Storag...

Страница 13: ...being used is suitable for use with flammable refrigerants i e non sparking adequately sealed or intrinsically safe 5 Presence of fire extinguisher If any hot work is to be conducted on the refrigerat...

Страница 14: ...safety checks and component inspection procedures If a fault exists that could compromise safety then no electrical supply shall be connected to the circuit until it is satisfactorily dealt with If th...

Страница 15: ...cumstances shall potential sources of ignition be used in the searching for or detection of refrigerant leaks A halide torch or any other detector using a naked flame shall not be used 6 Leak detectio...

Страница 16: ...not occur when using charging equipment Hoses or lines shall be as short as possible to minimise the amount of refrigerant contained in them Cylinders shall be kept upright Ensure that the refrigerat...

Страница 17: ...special cylinders for the recovery of refrigerant Cylinders shall be complete with pressure relief valve and associated shut off valves in good working order Empty recovery cylinders are evacuated an...

Страница 18: ...ditioning by yourself Unqualified repair will lead to failure of the warranty card and may cause damage to users or their properties Problems Reasons Solutions The air conditioning does not work There...

Страница 19: ...r The remote control is not aligned with the direction of the remote control receiver Batteries are dead Replace batteries Displays E1 The pipe temperature sensor is abnormal Check the pipe temperatur...

Страница 20: ...collection systems for used electrical and electronic products Please help us to conserve the environment we live in DECLARATION OF CONFORMITY Herewith Amiridis Savvidis S A states that this product c...

Отзывы: