background image

035-18579-001-B-0103

Unitary Products Group

5

3.

For ground level installation, a level pad or slab should 
be used. The thickness and size of the pad or slab used 
should meet local codes and unit weight. Do not tie the 
slab to the building foundation.

4.

For roof top installation, be sure the structure will support 
the weight of the unit plus any field installed components. 
Unit must be installed on a level roof curb or appropriate 
angle iron frame providing adequate support under the 
compressor/condenser section.

5.

Maintain level tolerance of unit to 1/8" maximum.

CLEARANCES

All units require certain clearances for proper operation and
service. Refer to Table 10 for the clearances required for
combustion, construction, servicing and proper unit opera-
tion.

RIGGING OR HANDLING

Care must be exercised when moving the unit. Do not
remove any packaging until the unit is near the place of
installation. Rig unit with slings placed under the unit.
Spreader bars of sufficient length should be used across the
top of the unit.

Units may also be moved or lifted with a fork-lift. Slotted
openings in the skid are provided for this purpose. Forks
must pass completely through the base.

Refer to Table 2 for unit weights and to Figure 2 for approxi-
mate center of gravity.

DUCT WORK

These units are adaptable to downflow use as well as rear
supply and return air duct openings. To convert to downflow,
use the following steps:

1.

Remove the duct covers found in the bottom return and 
supply air duct openings. There are four (4) screws 
securing each duct cover (save these screws to use 
later).

2.

Install the duct covers, removed in step one, to the rear 
supply and return air duct openings. Secure with the four 
(4) screws used in step one.

3.

Seal duct covers with silicone caulk.

Do not permit overhanging structures or shrubs to
obstruct the condenser air discharge, combustion
air inlet or vent outlet.

Before lifting a unit, make sure that its weight is
distributed equally on the cables so that it will lift
evenly.

TABLE 2: UNIT WEIGHTS AND CENTER OF 
GRAVITY

UNIT

SIZE

SHIPPING

WEIGHT

(

LBS

.)

OPERATING

WEIGHT

(

LBS

.)

CORNER WEIGHTS

(

LOCATION

LBS

.)

“A”

“B”

“C”

“D”

036

400

395

100

96

98

101

048

475

470

133

130

102

104

FIGURE 2:

UNIT CENTER OF GRAVITY

"A"

"B"

"C"

"D"

49-1/8

25

25

47-1/4

FRONT

OF

UNIT

CENTER OF

GRAVITY

Содержание CHAMPION PLUS DNP 036

Страница 1: ...to clarify or make the installation easier Cautions are given to prevent equipment damage Warnings are given to alert installer that personal injury and or equipment damage may result if installation...

Страница 2: ...AS 16 TROUBLE SHOOTING 18 TYPICAL WIRING DIAGRAM NOTES 22 LIST OF FIGURES Fig Pg 1 PRODUCT NOMENCLATURE 4 2 UNIT CENTER OF GRAVITY 5 3 FIELD WIRING DIAGRAM CONTROL WIRING 7 4 POWER WIRING FIELD DIAGRA...

Страница 3: ...er CAUTIONS are given to prevent equipment damage WARNINGS are given to alert the instal ler that personal injury and or equipment damage may result if installation procedure is not handled properly I...

Страница 4: ...llation only 2 Condenser must have an unlimited supply of air Where a choice of location is possible position unit on either north or east side of building FIGURE 1 PRODUCT NOMENCLATURE TABLE 1 UNIT A...

Страница 5: ...be moved or lifted with a fork lift Slotted openings in the skid are provided for this purpose Forks must pass completely through the base Refer to Table 2 for unit weights and to Figure 2 for approx...

Страница 6: ...nents is provided by the fol lowing removable panels Blower compartment Gas control electrical service access Refer to Figure 7 for location of these access panels and min imum clearances in Table 10...

Страница 7: ...N O T E H E A T A N T I C I P A T O R S H O U L D B E S E T A T 0 3 5 A M P S F O R A L L M O D E L S 2 4 V O L T T R A N S F O R M E R FIGURE 4 POWER WIRING FIELD DIAGRAM G R O U N D L U G R E F E R...

Страница 8: ...shown Continuous return air temperature should not be below 55 F TABLE 4 PROPANE1 LP GAS APPLICATION DATA AVAILABLE ON MODELS INPUT CAPACITY MBH 2 OUTPUT CAPACITY MBH GAS RATE3 FT 3 HR NUMBER OF BURN...

Страница 9: ...manual shut off valve may have to be installed outside of the unit 3 Use wrought iron or steel pipe for all gas lines Pipe dope should be applied sparingly to male threads only FIGURE 5 EXTERNAL SUPPL...

Страница 10: ...to the outside of the side gas control electrical compartment with the screws provided in the bag attached to the inside of the gas control electrical compart ment see Figure 6 If flexible stainless s...

Страница 11: ...ill Size 55 53 GAS CONNECTION SIZE 1 2 NPTI 1 2 NPTI COMPRESSOR HERMETIC TYPE Qty 1 Scroll Scroll TABLE 8 ELECTRICAL DATA MODEL DNP POWER SUPPLY VOLTAGE LIMITATIONS1 COMPRESSOR COND FAN MOTOR FLA SUPP...

Страница 12: ...O N A I R I N L E T L O U V E R S F R O N T G A S E L E C T R I C C O N T R O L S E R V I C E A C C E S S C O M P A R T M E N T P A N E L O V E R A L L O V E R A L L All dimensions are in inches They...

Страница 13: ...5 8 DIA KNOCKOUT 1 2 NPTI CONNECTION LOW VOLTAGE CONN DIA KNOCKOUT 8 7 FIGURE 9 UNIT DIMENSIONS BACK BOTTOM 1 3 4 1 5 2 9 9 1 6 1 5 3 1 2 1 3 4 1 3 4 1 5 4 1 4 1 2 3 1 2 3 3 8 1 4 1 2 2 8 3 8 1 4 1 2...

Страница 14: ...ter a cool fan on delay timing of 2 seconds the circulating fan is energized at cooling speed When the thermostat is satisfied terminals G and Y are de energized de energizing the compressor and outdo...

Страница 15: ...to Figure 10 Adjust as follows 1 Remove the cap from the valve body See Figure 11 for location 2 To decrease the gas pressure turn the adjusting screw counterclockwise 3 To increase the gas pressure t...

Страница 16: ...rise or temperature difference between the return air and the heated air from the furnace must lie within the range shown on the rating plate and the data in Tables 3 and 4 After the temperature rise...

Страница 17: ...4 67 56 32 64 58 31 62 60 30 60 1 EXAMPLE By actual measurement it takes 38 seconds for the hand on the 1 cubic foot dial to make a revolution with just a 100 000 BTUH furnace running Using this infor...

Страница 18: ...CHECKOUT procedures Troubleshooting of components necessitates opening the electrical control box with the power connected to the unit Use extreme care when working with the live circuits Check the u...

Страница 19: ...035 18579 001 B 0103 Unitary Products Group 19 FIGURE 14 TYPICAL WIRING DIAGRAM 208 230 1 60 POWER SUPPLY...

Страница 20: ...035 18579 001 B 0103 20 Unitary Products Group FIGURE 15 TYPICAL WIRING DIAGRAM 208 230 3 60 POWER SUPPLY...

Страница 21: ...035 18579 001 B 0103 Unitary Products Group 21 FIGURE 16 TYPICAL WIRING DIAGRAM 460 3 60 POWER SUPPLY...

Страница 22: ...s present wire 202 Y is connected to ASCT 3 If neither LR or ASCT are present Wire 202 Y is connect to M1 coil Open all disconnects before servicing this unit FIGURE 17 TYPICAL WIRING DIAGRAM LEGEND1...

Страница 23: ...035 18579 001 B 0103 Unitary Products Group 23...

Страница 24: ...o change without notice Printed in U S A Copyright by Unitary Products Group 2003 All rights reserved Supersedes 035 18579 000 A 0302 035 18579 001 B 0103 Unitary 5005 Norman Products York OK Group Dr...

Отзывы: