Sageon III Power System
Installation
PM990-8800-00, Rev. 9
2-21
FIGURE 2-18 CONNECTIONS ON CONTROLLER BACKPLANE
(1) Remote communications module connection (14-way ribbon)*
(2) Auxiliary peripheral module (relays, battery cell monitor, etc) connection (16-way ribbon)*
(3) Battery (& load) distribution module connection (34-way ribbon)*
(4) Ambient temperature sensor connection
(5) Battery temperature sensor connection *
(6) Rectifier isolated communications connection (10-way ribbon)*
(7) Standalone system voltage connection (Controller power and voltage sensing)
(8) Load circuit breaker trip detection circuitry connection*
Notes:
* Devices and cable connections are pre-wired as part of the supplied and tested Power plant
FIGURE 2-19 TEMPERATURE CONCENTRATOR BOARD
TEMP4
TEMP3
TEMP2 TEMP1
Содержание Sageon III
Страница 43: ...Installation Sageon III Power System PM990 8800 00 Rev 9 2 22 FIGURE 2 20 SAGEON III BOARD LOCATIONS...
Страница 46: ...Sageon III Power System Commissioning PM990 8800 00 Rev 9 3 3 FIGURE 3 1 SINGLE PHASE FEED PHASE TO NEUTRAL...
Страница 47: ...Commissioning Sageon III Power System PM990 8800 00 Rev 9 3 4 FIGURE 3 2 SINGLE PHASE FEED PHASE TO PHASE...
Страница 50: ...Sageon III Power System Commissioning PM990 8800 00 Rev 9 3 7 FIGURE 3 5 Y THREE PHASE FEED PHASE TO NEUTRAL...