GENISYS II System Hardware Installation
UNION SWITCH & SIGNAL
SM-6900B Rev. 0.0
August 1999
3-17
MASTER
GENISYS II
CPU CONN. A
CONNECTION TO
ADDITIONAL
GENISYS II
SLAVES
SLAVE
GENISYS II
CPU CONN. A
PORT 3
PORT 3
C14
RTS
E16
TXD
E14
RXD
E10
DCD
C26
-12V
E12
CTS
E18
RXREF
C18
COM
R
DCD
E10
RXD
E14
TXD
E16
RTS
C14
-12V
C26
CTS
E12
COM
C18
RXCOM
E18
1.
Resistor (R) is 10K ohm, ½ watt.
2.
For full-duplex GENISYS protocol connection, RTS and DCD need not be connected.
3.
Serial commons are interconnected through battery that powers units.
F
IGURE
3-4. T
YPICAL
GENISYS II M
ASTER
T
O
GENISYS II S
LAVE
RS-423 D
IRECT
W
IRE
S
ERIAL
I
NTERFACE
U
NITS
P
OWERED
B
Y
S
AME
B
ATTERY
(H
ALF
-D
UPLEX
GENISYS P
ROTOCOL
)
Содержание GENISYS II
Страница 4: ......
Страница 6: ...GENISYS II System Hardware Installation UNION SWITCH SIGNAL 1 2 August 1999 SM 6900B Rev 0 0 ...
Страница 12: ...UNION SWITCH SIGNAL GENISYS II System Hardware Installation 2 ii August 1999 SM 6900B Rev 0 0 ...
Страница 38: ...UNION SWITCH SIGNAL GENISYS II System Hardware Installation 2 26 August 1999 SM 6900B Rev 0 0 ...
Страница 40: ...UNION SWITCH SIGNAL GENISYS II System Hardware Installation 3 ii August 1999 SM 6900B Rev 0 0 ...
Страница 60: ...UNION SWITCH SIGNAL GENISYS II System Hardware Installation 3 20 August 1999 SM 6900B Rev 0 0 ...
Страница 62: ...UNION SWITCH SIGNAL GENISYS II System Hardware Installation 4 ii August 1999 SM 6900B Rev 0 0 ...
Страница 66: ...UNION SWITCH SIGNAL GENISYS II System Hardware Installation 4 4 August 1999 SM 6900B Rev 0 0 ...
Страница 67: ......