UNION SWITCH & SIGNAL
GENISYS II System Hardware Installation
3-12
August 1999
SM-6900B Rev. 0.0
3.2.9 Configuring GENISYS II CPU Serial Communication Jumpers
The GENISYS II hardware and executive software current at the time of release of this document
REQUIRES that jumpers JMP7, JMP8, JMP10, JMP13, JMP14, JMP15, JMP16, JMP17, and
JMP18 be placed in the factory default position. Future releases of the GENISYS II hardware
and executive software may support other jumper settings. Both jumpers JMP11 and JMP12
must be set in the same position but may be set as required by the specific installation. However,
the default setting for JMP11 and JMP12 is recommended for ALL installations (see table
below).
The following table shows the function of all serial communication jumpers and their default
position:
JUMPER
FUNCTION
POSITION
EFFECT
JMP7
Port 4 receive data input
1-2*
2-3
ENABLED
DISABLED
JMP8
Port 4 data carrier detect input
1-2*
2-3
ENABLED
DISABLED
JMP10
Port 1 synchronous transmitter clock
1-2
2-3*
INPUT
OUTPUT
JMP11
Port 3 output driver low level
1-2*
2-3
RS-232
RS-423
JMP12
Port 3 output driver high level
1-2*
2-3
RS-232
RS-423
JMP13
Port 3 synchronous transmitter clock
1-2
2-3*
INPUT
OUTPUT
JMP14
Port 3 synchronous transmitter clock
1-2*
2-3
OUTPUT
INPUT
JMP15
Port 4 asynchronous clock input
1-2*
2-3
INTERNAL
OFF
JMP16
Port 3 asynchronous clock or
synchronous receiver clock input
1-2*
2-3
INTERNAL
EXTERNAL
JMP17
Port 2 asynchronous clock input
1-2*
2-3
INTERNAL
OFF
JMP18
Port 1 asynchronous clock or
synchronous receiver clock input
1-2*
2-3
INTERNAL
EXTERNAL
JMP32
Route Serial Port 4 TXD to Rear Conn.
Route Maint. Port TXD to Rear Conn.
1-2*
2-3
JMP33
Route Serial Port 4 RXD to Rear Conn.
Route Maint. Port RXD to Rear Conn.
1-2*
2-3
Jumper positions marked with (*) are the factory default.
Содержание GENISYS II
Страница 4: ......
Страница 6: ...GENISYS II System Hardware Installation UNION SWITCH SIGNAL 1 2 August 1999 SM 6900B Rev 0 0 ...
Страница 12: ...UNION SWITCH SIGNAL GENISYS II System Hardware Installation 2 ii August 1999 SM 6900B Rev 0 0 ...
Страница 38: ...UNION SWITCH SIGNAL GENISYS II System Hardware Installation 2 26 August 1999 SM 6900B Rev 0 0 ...
Страница 40: ...UNION SWITCH SIGNAL GENISYS II System Hardware Installation 3 ii August 1999 SM 6900B Rev 0 0 ...
Страница 60: ...UNION SWITCH SIGNAL GENISYS II System Hardware Installation 3 20 August 1999 SM 6900B Rev 0 0 ...
Страница 62: ...UNION SWITCH SIGNAL GENISYS II System Hardware Installation 4 ii August 1999 SM 6900B Rev 0 0 ...
Страница 66: ...UNION SWITCH SIGNAL GENISYS II System Hardware Installation 4 4 August 1999 SM 6900B Rev 0 0 ...
Страница 67: ......