25
Make Ready the Coating Pump & Unit
Before you begin coating a job, the Coating Unit should be cleaned of any excess coating left over
from the previous runs. For best results use UV Klean and/or Aque Klean as a part of your daily
cleaning procedure
NOTE:
Clean the Coating Unit, Impression Roller and Doctor Blade Assembly after each
shift and/or after each job if necessary.
NOTE:
If using an Aqueous coating or primer, it is important to clean the coating unit, impression
roller and doctor blade assembly immediately following the completion of your job.
1.
Be sure to mix your coating well (shake the bucket) prior to use.
2. Make sure the hose is secure in the coating pump and is in the proper coating bucket.
3.
Be sure to adjust the Metering Pressure to the desired setting before filling. If left in the
“END OF
DAY POSITION”
while filling, coating could leak through the gap.
4. Go to the Pump Screen by pressing “F3” from the Home Screen.
5.
Press “F9” to turn ON the MANUAL pump. (Pump will stay ON as long as you hold the button)
6.
Press “F7” to turn ON the AUTO Pump option (If Equipped w/ Sensor)
NOTE:
If your
iColor coater
is equipped with the Automatic Coating Sensor, see the next
section on “Setting the Optional Automatic Coating Sensor” before completing the set up.
PUMP SCREEN
Figure - Coating Pump
Coating Pump
Manual Coating Fill Button