When
ABC is
installed in the panel or utility room, take into account the
requirements of Para 7
.
2. Properly secure the case of battery charger on the vertical bulkhead with the help of bolts or
self-tapping screws
. By the effort of hand check for reliability of its fastening. The information on
installation and overall dimensions of ABC are specified in installation diagram of this OM (refer to
Figure 2
);
3. Bring the cables of connected devices to
ABC
. Use the cable of
КМПВ
(
Э)
brand or its
substitutes with the appropriate cross-section of cores. When selecting the cable use information on
diameters of cable leads (
Table 2
) and maximum dimensions of cross-sections of ABC terminals (
Table
3
).
CAUTION! Before laying and connecting the cables to
ABC
decide if there is a
requirement to use
ABC
function on protection of
AB from
deep discharge and select the
appropriate method of load connection to accumulator battery (refer to Para 5.2.4).
Figure 2 Overall dimensions and installation diagram of ABC
grounding
Gland MG16
Gland MG25
Gland MG32
Gland MG20
M5