Unicont SPb Ltd
Technical Documentation CH-105
Page 5
I
t
Main charging
phase
Terminal charging phase
U
t
Charging
voltage
AB low
voltage level
Main charging
phase
Terminal charging phase
Figure 1 ABC charging current and voltage curves
5.
Installation and connection of battery charger
5.1
Installation
ABC is installed in the following sequence:
1.
Select and prepare the place for installation of the device so as to ensure free access,
input of cables and termination of their ends. Vertical bulkhead inside the vessel is a convenient
place for installation.
CAUTION!
When
selecting the place for installation of the device ensure safe
distance to the port-hole so that the water splashes do not penetrate the device when the
port-hole is opened.
ABC shall be installed at a
distance at least 1 m away from magnetic compass.