Installation instructions
33
20 - 500K
BOILER DYNAMICS DOWNWARD
20K
5 - 500
RESET TIME
50
0% - 100%
MODULATION MAX
80%
0% - 100%
MODULATION MIN
50%
0% - 100%
MIN MODULATION HS
0%
40% - 100%
MODULATION DHW
80%
----
BOILER SEQUENCE 1
----
BOILER SEQUENCE 2
Default
Individual values
Value range
Description
10 - 800 HOURS
SEQUENCE CHANGE
200 HOURS
00 min - 30 min
CYCLE BLOCK
00 - 01
BOILER COOLING FUNCTION
30°C - 120°C
BOILER COOLING TEMPERATURE
00 - 06
HS 1 TYPE
01 - 03
HS 2 STORAGE TANK
01 - 01 - 02
BUFFER
00, 01 (OFF / ON)
SCREED
00 - 04
HS 1 BUS
00 - 05
HS 2 TYPE
** see note
SCREED PROGRAM
2K - 20K
HYSTERESIS BURNER 2
01 - 06
SEQUENCE MODE
* Set value of first stage of first boiler at 1, in the second leave dashes.
Set value of first stage of second boiler at 1, in the second leave dashes.
If there are more than 2 boilers in cascade, enable the first stages of the boilers in cascade.
** See E8.5064 heating controller instruction book
Default
Individual values
Value range
Description
DOMESTIC HOT WATER PRODUCTION
CHARGE PUMP
PARALLEL PUMP RUNNING
T DHW
DHW HYSTERESIS
5 degrees
DHW FOLLOWUP
THERMOSTAT INPUT
THERMOSTAT FUNCTIONING
Exit level using
RETURN
LOAD THROUGH
Default
Individual values
Value range
Description
HEATING CIRCUIT 1
00 - 04
HEATING CIRCUIT FUNCTION
0
00 - 03
PUMP MODE
0
5 - 25
MIXER OPEN
----
5 - 25
MIXER CLOSED
----
12345678
87654321
01
00 min
00
95
06
00
00
00 OFF
04
00
2K
00 - 01 (OFF / ON)
01 (ON)
00 , 01, 02, 03
01
00K - 50K
20K
5K - 30K
00 min - 30 min
00 min
00, 01 (OFF / ON)
00 OFF
00, 01 (OFF / ON)
00 OFF
00, 01 (OFF / ON)
00 OFF
Содержание XC-K Series
Страница 1: ...INSTALLATION AND MAINTENANCE INSTRUCTIONS 44879 03 12 rev 0 XC K...
Страница 57: ...Inspections and maintenance 57...
Страница 58: ...58 Inspections and maintenance...
Страница 59: ...Inspections and maintenance 59...