background image

20

Installation instructions

3.12 - CONNECTING GAS

Danger!
The gas connection must be carried out only
by a qualified installer who must respect and
apply that foreseen by relevant laws in force in
the local prescriptions of the supply company.
Incorrect installation can cause damage to
persons, animals and objects for which the
manufacturer cannot be held responsible.

Before installation, we recommend a thorough
inner cleaning of all fuel adduction piping to
remove any residue which could jeopardise
proper operation of the boiler.

Attention!
Make sure that there are no mechanical tension
points while connecting gas to avoid the risk
of leakage!

Perceiving the smell of gas:
a) Do not turn electric switches on or off,

use a telephone or any other object which
can create sparks;

b) Immediately open doors and windows to

create an air current to air out the room;

c) Shut the gas cocks;
d) Request the intervention of professionally

qualified personnel.

As a precaution against gas leaks, we
recommend installing a monitoring and
protection system consisting in a gas leak
detector coupled with a shut-off solenoid
valve on the gas feed line.

The supply pipes must have a cross-section sufficient for the
flow rate of the burner.

You should nonetheless comply with the “General installation
regulations” laid down in the standards.

Before commissioning an internal gas distribution system and
therefore before connecting it to the gas meter, check its sealing
carefully.

If any part of the system is out of sight, the sealing test must
be done before the pipes are covered.

Before connecting the appliances, the system must be tested
with air or inert gas at a pressure of at least 100 mbar.

The following operations and checks must also be performed
while commissioning the system:
-

Open the meter and air release valve to bleed the air from
the piping of the appliances, proceeding one appliance after
another.

-

With the appliances closed, check that there are no gas
leaks. The pressure gauge must show no pressure drop
during the second quarter of an hour from the start of the
test. Gas leaks must be found with a soapy solution or
similar product and eliminated.
Never look for gas leaks with an open flame.

NOTE

The water pressure in the heating system must
not be drop below 1 bar; open the filling tap when
pressure is too low.
This operation must be performed with the system
cool.

NOTE

If the boiler was without electric power, after certain
idle period, the pump could be blocked. Before
turning on the main switch, the pump must be
unblocked by operating as follows:
Introduce a screwdriver in the hole below the
protective screw in the centre of the pump intended
for this purpose and turn the pump shaft
clockwise.
After having unblocked the pump, tighten the
protective screw and make sure there is no water
leakage.

ATTENTION!

After removing the protective screw, a small
amount of water could leak out.
Dry off all wet surfaces before powering the boiler.

Содержание XC-K Series

Страница 1: ...INSTALLATION AND MAINTENANCE INSTRUCTIONS 44879 03 12 rev 0 XC K...

Страница 2: ...12 Connecting gas 20 3 13 Packaging 21 3 14 Assembling casing 22 3 15 Electrical connections 24 3 16 MODULATING MASTER panel board code 37892 26 3 17 Programming heating controllers with single boiler...

Страница 3: ...occasion also check the state of wear of the anode 1 4 INFORMATION FOR SYSTEM MANAGER The user must be instructed concerning the use and operation of his heating system in particular Deliver these in...

Страница 4: ...rts which affect the operating safety of the appliance Attention To tighten or loosen the screwed fittings use only appropriate fixed spanners Incompliant use and or inappropriate tools can cause dama...

Страница 5: ...the document case it must be applied by the installer on the outside of the casing The serial number of the boiler is on the riveted plaque on the front plate of the body front right bottom side Cond...

Страница 6: ...ot try to repair it or intervene on it directly Contact only personnel qualified in compliance with law Any repairs must be performed solely by personnel authorised by Unical using original spare part...

Страница 7: ...re designed to operate with ON OFF dual stage or modulating burner as long as the minimum heat output that can be reached is no lower than the value indicated on the technical data plate The boilers a...

Страница 8: ...140 Pressure drop water side kPa 1 5 9 8 Pressure drop flue side daPa Maximum operating pressure boiler bar 6 Weight kg 365 Minimum dimensions for boiler room access Pressure drops corresponding to a...

Страница 9: ...rop water side kPa 3 8 2 5 3 2 2 2 9 18 6 25 4 32 3 34 3 39 2 Pressure drop flue side daPa Maximum operating pressure boiler bar 6 6 6 6 6 Weight kg 525 660 800 1007 1137 XC K 200 570 fig 4 200 290 40...

Страница 10: ...8 1983 CONNECTIONS T1 T2 UNI 2276 PN6 T4 UNI 2276 PN6 T5 ISO 7 1 T6 mm DN 125 DN 125 DN 150 DN 150 DN 200 DN 200 DN 125 DN 125 DN 150 DN 150 DN 200 DN 200 DN 65 DN 65 DN 80 DN 80 DN 100 DN 100 Rp 1 R...

Страница 11: ...0 60 C Nominal heat output 50 30 C Nominal heat input Heat efficiency at nominal load 80 60 C Heat efficiency at nominal load 50 30 C Heat efficiency at 30 load Combustion efficiency 80 60 C Combustio...

Страница 12: ...b Check that boiler is set up to operate with the available type of fuel This can be seen written on the package and on the technical feature plate c Check that the chimney flue has an appropriate dr...

Страница 13: ...cable technical standards XC K is a steel boiler which can be combined with air blown burners operating on gas of category II2H3 Contact the gas supplying company before installing the appliance Direc...

Страница 14: ...hooks or shifting it on rollers underneath the sturdy base longerons 3 5 BURNER The burners operating with the XC K boilers must have the EC certification and comply with Gas appliance directive 90 39...

Страница 15: ...ep it from blackening If the cooling tube is not connected to the sight glass it could break ATTENTION the flame sight glass can be very hot therefore pay the utmost attention fig 13 3 5 2 INSTALLING...

Страница 16: ...B Crosswise rotation loosening the hinges fixed on the front plate of the boiler and moving them sideways C Axial rotation screwing different tightening nuts fig 14 3 7 2 XC K 1140 XC K 1420 BOILERS F...

Страница 17: ...ollowing adjustments can be made on the door of these boiler models A Vertical adjustment by acting on the nut of the upper hinge pin which the door turns on B Crosswise rotation loosening the hinges...

Страница 18: ...for the evacuation of combustion products which must be filled after assembly and must remain at least 25 mm high with the boiler running see fig 17 Do not discharge condensation through gutter drainp...

Страница 19: ...s precaution is not taken triggering of the safety valve can cause damage to persons animals and objects for which the manufacturer cannot be held responsible Connection of expansion vessel XC K boile...

Страница 20: ...n system and therefore before connecting it to the gas meter check its sealing carefully If any part of the system is out of sight the sealing test must be done before the pipes are covered Before con...

Страница 21: ...astic bags etc must be kept out of the reach of children as they are potential sources of danger Unical will not be held liable for damage to persons animals or objects due to failure to comply with t...

Страница 22: ...having greased the relevant part with the specific solvent The plates are included in the document envelope Assembly sequence Ref fig 18 21 A Mount the insulation jackets pos 1 and 2 of the boiler bo...

Страница 23: ...nd insert the electric inlet cables and the outlet probe capillaries through the slots at the base Fit the panel board to the upper panel pos 9 Fit the upper panel pos 9 complete with panel board to t...

Страница 24: ...electric inlet cables and the outlet probe capillaries through the slots at the base Fit the panel board to the upper panel pos 13 Fit the upper panel pos 13 complete with panel board to the two side...

Страница 25: ...wet and or moist parts of the body and or in bare feet do not pull the electric cables do not leave the appliance exposed to atmospheric agents rain sun etc unless expressly designed do not allow chi...

Страница 26: ...e system pump switch 21 Pz2 mixed zone system pump switch 33Working thermostat 35Safety thermostat The heating controller probes boiler storage tank external flow are included in the supply the ambien...

Страница 27: ...110 C MAX T HS2 85 C 01 08 BOILER BUS ID 10 C 80 C MIN T HS2 10 C 0 11 VOLTAGE CURVE 11 0 00 10 00V CURVE 11 U2 0V 0 00 10 00V CURVE 11 U2 10V 00 120 C CURVE 11 T1 0 C 00 120 C CURVE 11 T2 100 C 0 00...

Страница 28: ...ault Individual values Value range Description DOMESTIC HOT WATER PRODUCTION 00 01 OFF ON CHARGE PUMP 01 ON 00 01 02 03 PARALLEL PUMP RUNNING 01 00K 50K T DHW 20K 5K 30K DHW HYSTERESIS 5 degrees 00 mi...

Страница 29: ...1 02 00 03 MF 1 4 T NOM 30 C 5 25 MF 1 4 HYSTERESIS 5 C 5 25 F 15 FUNCTION 0 Exit level using RETURN C OK 1 2 1 2 1s C C C BUS ID 1 2 11 Mod Run 2 1 PARAMETERS PROGRAMMABLE BY TECHNICIAN FOR HEATING C...

Страница 30: ...domestic hot water production Key M flow Rat HIGH temperature return Rbt LOW temperature return Vmix2 zone mixer valve motorised Pz1 HIGH TEMPERATURE zone heating system pump Pz2 LOW TEMPERATURE zone...

Страница 31: ...pump for DHW production switches on automatically and will only switch off when the temperature set on the heating controller has been reached The panel is set up to manage the modulating burners Wit...

Страница 32: ...TED BY ACCESS CODE FOR HEATING CONTROLLER type E8 5064 00 01 OFF ON TEMPERATURE MASTER 30 C 110 C MAX T HS1 MAX T HEADER 10 C 80 C MIN T HS1 MIN T HEADER 01 ON 85 C 10 C 0 01 BUS CONNECTION 01 00 01 O...

Страница 33: ...1 in the second leave dashes Set value of first stage of second boiler at 1 in the second leave dashes If there are more than 2 boilers in cascade enable the first stages of the boilers in cascade See...

Страница 34: ...ED MAX FLOW TEMPERATURE MIN FLOW TEMPERATURE FROST PROTECTION TEMP OUTSIDE TEMP DELAY HEATING SLOPE DISTANCE B HEAT SINK Exit level using RETURN Default Individual values Value range Description SOLAR...

Страница 35: ...2 Press OK 2 3 Turn the knob 3 until mm appears on the display 4 Press OK 2 2 1 Switch the selector 1 to the symbol of the mixer valve 2 Press OK 2 3 Turn the knob 3 until the number 15 appears on the...

Страница 36: ...working temperature of the boiler n 2 is regulated by the heating controller to achieve this the thermostat must be placed at maximum full scale pos 32 Modulation of the burner will be managed by heat...

Страница 37: ...2 Press OK 2 3 Turn the knob 3 until mm appears on the display 4 Press OK 2 2 1 Switch the selector 1 to the symbol of the mixer valve 2 Press OK 2 3 Turn the knob 3 until the number 15 appears on the...

Страница 38: ...ion fig 28 Ps DHW recirculation pump P1 circulation pump Pb DHW production charge pump SPF storage tank probe KF E8 5064 heat control boiler probe KF 1 Lago Basic 0201 RV 1 heat control boiler probe V...

Страница 39: ...e storage tank charge pump for DHW production switches on automatically and will only switch off when the temperature set on the heating controller has been reached The panel is set up to manage the m...

Страница 40: ...system pump switch 21 Pz2 mixed zone system pump switch 33Working thermostat 35Safety thermostat The heating controller probes boiler storage tank external flow are included in the supply the ambient...

Страница 41: ...ODULATION CASCADE DHW LEVELS CONTROL VARIANCE DISPLAY NOMINAL OUTPUT INDEX DISPLAY SWITCH VALUE DISPLAY REMAINING min BLOCK TIME DISPLAY MAXIMUM BOILER TEMPERATURE BOILER DYNAMICS UPWARD BOILER DYNAMI...

Страница 42: ...YSTERESIS 5 degrees DHW FOLLOWUP THERMOSTAT INPUT THERMOSTAT FUNCTIONING Exit level using RETURN LOAD THROUGH Default Individual values Value range Description HEATING CIRCUIT 1 HEATING CIRCUIT FUNCTI...

Страница 43: ...PARAMETERS PROGRAMMABLE BY TECHNICIAN FOR HEATING CONTROLLER Lago Basic 0201 RV 1 1 2 3 1 1 Switch selector to burner 1 2 Press OK 2 3 Turn the knob 3 until 2 appears on the display dual stage burner...

Страница 44: ...zone 1 low temperature zone controlled by a motorised mixer valve domestic hot water production Key Vmix2 zone mixer valve motorised Pz1 HIGH TEMPERATURE zone heating system pump Pz2 LOW TEMPERATURE z...

Страница 45: ...pump for DHW production switches on automatically and will only switch off when the temperature set on the heating controller has been reached The panel is set up to manage the modulating burners With...

Страница 46: ...T HS1 MAX T HEADER MIN T HS1 MIN T HEADER BUS CONNECTION BUS SUPPLY HYSTERESIS HYSTERESIS TIME MINIMUM LIMIT MAX T HS2 BOILER BUS ID MIN T HS2 VOLTAGE CURVE CURVE 11 U2 CURVE 11 U2 CURVE 11 T1 CURVE...

Страница 47: ...ble the first and second stages of the boilers in cascade See E8 5064 heating controller instruction book Default Individual values Value range Description DOMESTIC HOT WATER PRODUCTION CHARGE PUMP PA...

Страница 48: ...ED MAX FLOW TEMPERATURE MIN FLOW TEMPERATURE FROST PROTECTION TEMP OUTSIDE TEMP DELAY HEATING SLOPE DISTANCE B HEAT SINK Exit level using RETURN Default Individual values Value range Description SOLAR...

Страница 49: ...2 Press OK 2 3 Turn the knob 3 until mm appears on the display 4 Press OK 2 2 1 Switch the selector 1 to the symbol of the mixer valve 2 Press OK 2 3 Turn the knob 3 until the number 15 appears on the...

Страница 50: ...working temperature of the boiler n 2 is regulated by the heating controller to achieve this the thermostat must be placed at maximum full scale pos 32 Modulation of the burner will be managed by heat...

Страница 51: ...1 2 Press OK 2 3 Turn the knob 3 until 2 appears on the display dual stage burner 4 Press OK 2 2 1 Switch the selector 1 to the symbol of the mixer valve 2 Press OK 2 3 Turn the knob 3 until the numb...

Страница 52: ...ystem consisting in 2 boilers in cascade serving 1 high temperature zone 1 low temperature zone controlled by a motorised mixer valve domestic hot water production Boiler n 1 is fitted with a panel bo...

Страница 53: ...e storage tank charge pump for DHW production switches on automatically and will only switch off when the temperature set on the heating controller has been reached The panel is set up to manage the m...

Страница 54: ...RATING INSTRUCTIONS Information for system manager The system manager must be instructed concerning the use and operation of his heating system in particular Give the system manager the SYSTEM MANAGER...

Страница 55: ...enance is required to eliminate any differences between the actual status and the nominal status This is normally done by cleaning setting and replacing individual components subject to wear Maintenan...

Страница 56: ...w signs of deterioration if so they must be replaced using only original spare parts Maintenance of burner Burner maintenance must be carried out by personnel authorised by its manufacturer or else th...

Страница 57: ...Inspections and maintenance 57...

Страница 58: ...58 Inspections and maintenance...

Страница 59: ...Inspections and maintenance 59...

Страница 60: ...www unical eu info unical ag com Unical will not be held responsible for possible inaccuracies if due to transcription or printing errors It also reserves the right to modify its products as deemed n...

Отзывы: