31
32
B. Testing of insulation resistance between grounding of primary winding and
secondary winding
Fig. 10.2.2 Connection of testing
C. Testing of insulation resistance between secondary windings
Fig. 10.2.3 Connection of testing
Black
Black
Red
Red
XI. Maintenance
Clean the casing:
1. Wipe the surface using soft cloth or sponge dipped with water
2. Do not immerse the tester in water to avoid tester damage.
3. Do not store the tester if it is wet.
4. The calibration and maintenance must be performed by qualified professional
repair personnel or specified repair department.
The contents of the User Manual are subject to change without further notice.
UT512D/E User Manual
UT512D/E User Manual