background image

Operating and mounting manual 

         (translation) 

EVF 
 
 

 

 _______________________________________________________________________________________________________  

220.100.112-07 

Page 7 /13

 

Version: 12/2015 

TM 3926 

 

 

 

 

DANGER!

 

Before commissioning a new installation or before starting up an installation again 
after repairs or modifications, ensure: 

 

The proper completion of all installation and assembly work! 

 

Commissioning only by “qualified staff” (see point 2.3). 

 

Installation or repair of existing guards and protection equipment. 

 

6.1 Commissioning 

 

Before commissioning, check the data on material, pressure, temperature and flow direction 
with the layout plan of the pipework system. 

 

Depending on the field of application, the local regulations have to be observed, e.g. the 
operation safety order. 

 

Residues in the pipework and the valve (dirt, weld beads, etc.) will inevitably result in leaks. 

 

Leakage inspection of the installed valve. 

 

6.2 Shutting 

down 

  Depending on the field of application, the local regulations have to be observed, e.g. the 

operation safety order. 

 

6.3 Maintenance 

Solenoid valves have to be checked at regular intervals for proper function and internal leak tightness. 
The intervals for regular inspections have to be defined by the operator according to the operating 
conditions. UNI-Geräte recommends an internal visual inspection once a year and an overhaul of the 
valve after 2 years or after the following number of switching cycles at the latest: 
 
 

Application 

temperature 

DN 

 25 

 DN 80 

 DN 150  > DN 150

 25°C 

150 000 

75 000 

25 000 

20 000 

> 25°C 

50 000 

25 000 

25 000 

5 000 

 
Repair or maintenance works at the manufacturing company (UNI- Geräte) 

  Valves and fittings must be delivered clean and free from substances which are harmful to 

health or to the environment

 

 
6.4 

Putting back into operation 

When putting a valve back into operation, ensure that all the necessary steps described in section 5.2 
(Installation) and section 6.1 (Commissioning) are repeated. 
 
 

7.0 Troubleshooting 

7.1 Detection 

of 

defects 

 
 

DANGER!

 

Be sure to observe the safety instructions during troubleshooting.

 

 
 
If the malfunctions cannot be remedied using the following 

“Troubleshooting plan (7.2)” 

please 

contact the manufacturer. 

 

In the event of faults in the function or operating behaviour of the valve, check whether the installation 
work was carried out and completed as described in this operating manual. 
Depending on the field of application, the operation safety order must be observed. 
 
Check the data on material, pressure, temperature, voltage and flow direction with the layout plan of 
the pipework system. In addition, check whether the operating conditions correspond to the technical 
data in the data sheet or on the rating plate. 

 

 

Содержание EVF Series

Страница 1: ...fety information for the use in explosion prone areas guideline 94 9 EC 3 0 Handling 3 1 Transport 3 2 Storage 3 3 Handling before mounting 4 0 Product Description 4 1 Function 4 2 Technical data 4 3...

Страница 2: ...of these operating instructions suppose the qualification of the user according to paragraph 2 3 qualified staff The operating staff must be trained in accordance with the operating instructions The...

Страница 3: ...TICE are used in this operating manual in case of notices concerning special dangers or for unusal information requiring a special marking DANGER means that in case of non observance there is danger t...

Страница 4: ...a pipe screws by means of tooth disc Otherwise the connection to the ground must be implemented by other measures e g cable links Control valves electrical and electrical mechanical drives as well as...

Страница 5: ...1 Fig in Fig 1 show the valve construction 4 1 Function On switching on of the solenoid drive 800 the solenoid core 207 is pulled against the upper part of housing 106 The pressure spring 503 is furth...

Страница 6: ...ion safety order and the qualified use of tools and protection equipment must be guaranteed The operating instructions for the valve must be observed during all work on or with the valve Failure to ob...

Страница 7: ...to the operating conditions UNI Ger te recommends an internal visual inspection once a year and an overhaul of the valve after 2 years or after the following number of switching cycles at the latest...

Страница 8: ...ir work Observe section 6 4 when putting the valve back into operation 8 0 Dismantling of the Valve In addition to the general installation guidelines and the operation safety order the following poin...

Страница 9: ...e all claims for damages against these companies will be voided 10 0 Explanations on Codes and Directives The Commission of the European Union has laid down common directives for the free trading of g...

Страница 10: ...13 Version 12 2015 TM 3926 11 0 Drawing 11 1 Fig 1 40 EVF NH DN15 DN25 55 EVF NH DN15 DN25 100 400 200 950 902 1 912 402 3 219 1 943 2 243 219 2 402 1 402 2 406 906 503 1 227 943 1 941 1 948 1 910 1 9...

Страница 11: ...er 110 1 Distanzst ck Spacer 120 1 Endschaltergeh use Limit switch housing 200 1 Ventilteller Valve disk 206 2 F hrungsring Guide ring 207 1 Magnetkern Solenoid core 210 5 Federbolzen Spring bolt 214...

Страница 12: ...906 1 Scheibe Washer 908 1 Sicherungsblech Safety plate 910 1 4 Zylinderschraube Cylinder screw 910 2 4 Zylinderschraube Cylinder screw 912 1 Splint Split pin 941 x 1 Gewindestift Setscrew 943 x 1 Sp...

Страница 13: ...ounting manual translation EVF _______________________________________________________________________________________________________ 220 100 112 07 Page 13 13 Version 12 2015 TM 3926 12 0 Declaratio...

Отзывы: