AP01-HD_rev.09_UK
53
Figure 5: Data Logger
12.5.
Plant certification Report (ICT)
Important printout for terrestrial and/or satellite TV plant certification can be produced in
this section. Guided procedure produces reports in language selected at that time.
Procedure consists in following steps:
•
Select instrument plan where there are acquired data related to TV plant to be
certified. Press
OK.
•
Select acquisition number related to RF signal in switchboard input. Press
OK
•
Select acquisition number related to RF signal in switchboard output. Press
OK
•
Select first acquisition number related to backbone distribution #1 of the plant.
Press
OK.
It is then asked to select second acquisition related to the same
backbone distribution, whether it exists select and confirm, whether it does
not exist leave space free and confirm. The system goes on to the second
backbone distribution.