![Ulvac PMB100D Скачать руководство пользователя страница 69](http://html1.mh-extra.com/html/ulvac/pmb100d/pmb100d_instruction-manual_4492079069.webp)
YK11-0016-DI-002-08
42
CAUTION
The Pump oil might deteriorate in a shorter time depending on the use.
It is recommended to replace the first pump oil within 10 days after
operation start and see how it got dirty to determine the oil
replacement cycle.
CAUTION
When using the automatic vacuum breaker (Time lag electromagnetic
leak valve which introduces the air in the pump by the valve opening
in 3
~
5 sec. after stopping the motor for the pump drive), do
connection so that it gangs with the motor.
4.2 Operation Start
4.2.1 Test run
Follow the procedure (1)
-
(4) below to start operation of the Pump unit.
(1)
Check and ensure that the piping and cable connection is completed .
(2)
Check the lubrication oil level .
(3)
Check the Cooling water.
Ensure that the Cooling water is flowing.
Check and ensure also that there is no cooling water leakage.
Cooling water volume:
PMB100D : air cooling
PMB300D : 2 L/min or more
PMB600D : 2 L/min or more
PMB1200D : 3 L/min or more
PMB2400D : 3 L/min or more
Содержание PMB100D
Страница 2: ......
Страница 3: ...Declaration of Conformity...
Страница 39: ...YK11 0016 DI 002 08 12 2 4 Dimensional drawing Fig 11 Dimensional drawing PMB100D...
Страница 40: ...YK11 0016 DI 002 08 13 Fig 12 Dimensional drawing PMB300D...
Страница 41: ...YK11 0016 DI 002 08 14 Fig 13 Dimensional drawing PMB600D...
Страница 42: ...YK11 0016 DI 002 08 15 Fig 14 Dimensional drawing PMB1200D...
Страница 43: ...YK11 0016 DI 002 08 16 Fig 15 Dimensional drawing PMB2400D...
Страница 62: ...YK11 0016 DI 002 08 35...
Страница 65: ...YK11 0016 DI 002 08 38...
Страница 72: ...YK11 0016 DI 002 08 45...
Страница 83: ...YK11 0016 DI 002 08 56 5 7 Optional attachment figure Fig 27 PMB100D Optional attachment figure...
Страница 84: ...YK11 0016 DI 002 08 57 Fig 28 PMB300D Optional attachment figure...
Страница 85: ...YK11 0016 DI 002 08 58 Fig 29 PMB600D Optional attachment figure...
Страница 86: ...YK11 0016 DI 002 08 59 Fig 30 PMB1200D Optional attachment figure...
Страница 88: ...YK11 0016 DI 002 08 61 Fig 32 PMB2400D Optional attachment figure If you have installed the inlet ISO K flange...
Страница 89: ...YK11 0016 DI 002 08 62 Fig 33 Dimensional drawing PMB2400D Horizontal exhaust model...
Страница 99: ...YK11 0016 DI 002 08 72...
Страница 105: ...YK11 0016 DI 002 08 78...
Страница 119: ......