ULTRAFRYER ZRT3-H Скачать руководство пользователя страница 6

ULTRAFRYER® LIMITED WARRANTY

Ultrafryer Systems warrants to the original purchaser of a gas or electric Ultrafryer® sold within the United States, it’s territories 

and Canada, that it will be free of defects in material and workmanship for the periods listed below:

STAINLESS STEEL FRYER VAT

 – 

Stainless Steel fryer vats are warranted for (10) ten years upon the terms hereinafter 

described. The (10) ten year warranty coverage applies ONLY to the Stainless Steel fryer vat and does not apply to the other 

components such as controls, fire boxes, gaskets, mounting hardware, or the heat shield weldment. The (10) ten year limited 

warranty coverage for the Stainless Steel fryer vats are as follows: (1) Vats that fail due to faulty workmanship or materials 

within the first twelve (12) months from the date of initial start up will be exchanged at no cost. Standard delivery ground 

freight will be prepaid by Ultrafryer 

Systems for first year failures only

. The cost of labor to install the replacement vat will 

be covered by Ultrafryer Systems for vats, which fail within twelve (12) months from the date of initial start up.  Labor for vat 

replacements after the first year is the responsibility of the owner.

(2) Vats that fail within the first (18) months will be exchanged at a cost not to exceed $100.00 FOB San Antonio. (3) Vats 

that fail within the first (24) months will be exchanged at a cost not to exceed $150.00 FOB San Antonio. (4) Vats that fail 

within the next (8) years will be exchanged at a cost not to exceed $

200

.00 FOB San Antonio. (Subject to inflation adjusted in 

accordance with the C.P.I.).  Proper credit issue for vat failures is contingent upon receipt, by Ultrafryer Systems, of the serial 

number identification tag for any failed vat.

ULTRAFRYER PARTS

 

– 

All parts on the Ultrafryer® are covered for a period of one (1) year from the initial date of start 

up. This is to include computers, gas valves, switches, thermostats, etc. Ultrafryer Systems reserves the right to charge for 

certain parts such as computers, filter pump

s

 and motors or any item over the amount of $100.00 until Ultrafryer Systems 

receives the defective part back

.  A

fter inspection, credit for the part will

 

be issued to the purchaser provided the part is 

deemed defective and that defect is not the result of neglect or abuse by the user. The shortening filtra

tion

 system, (hoses) 

are warranted for ninety (90) days from the initial date of start up. 

PROCESSING WARRANTY CLAIMS

 – 

The equipment owner must promptly notify Ultrafryer Systems Warranty 

Department of any alleged defects as soon as they are discovered by calling 1-800-525-8130. After such notice, the War-

ranty Department will perform its obligation under this warranty within a commercially reasonable period of time. If alleged 

defects develop after normal business hours, on weekends or on holidays the owner must call Ultrafryer Systems first at the 

above number. This number is monitored 24 hours a day, 7 days a week. Ultrafryer Systems will notify an authorized service 

agent to make repairs during normal hours or after hours. Any parts that need to be shipped back to Ultrafryer Systems will 

be shipped back 

prepaid by the customer

 marked with the processing number and to the

 

attention of the WARRANTY 

DEPARTMENT.  

NON WARRANTY COVERAGE

 – 

This warranty does not include coverage for any consequential cost of damages 

including, but not limited to, any loss in store sales, spoiled food products, transportation, duty or custom cost. This warranty 

does not cover the Ultrafryer® exported to countries outside the United States and its territories. This warranty does not cover 

original installation and adjustments such as leveling, calibrations, electrical and gas connections, or problems due to faulty 

or contaminated gas supply. This warranty does not cover travel over 100 miles or 2 hours driving time from the location of 

the Ultrafryer® or overtime or holiday charges unless the Warranty Department granted prior approval. This warranty does 

not cover damage due to misuse, abuse, alteration or accident. This Warranty does not cover improper or unauthorized repair 

or installation, damage in shipment, normal maintenance items such as gaskets, hoses, and exterior finishes. 

Ultrafryer Sys-

tems reserves the right to void component part warranty on any Ultrafryer® that is stored more than 6 (six) months 

after shipment from Ultrafryer Systems and not put into service. 

LABOR COVERAGE – 

The cost for labor to replace parts are covered for one (1) year after the initial start up. This war-

ranty will include the labor involved in the six (6) month and the twelve (12) month fryer inspections

 

recommended by the 

manufacturer for the first year after initial start up

. The Warranty Department must be promptly notified of any defects 

within the first year of operation. 

The labor warranty does not include the cost to repair or clear dirty

 

filter systems or per-

form any adjustments that would normally fall

 

under the tasks associated with a proper start up and/or demonstration

.

  

Labor 

is covered by Ultrafryer Systems for repairs by an AUTHORIZED service agent

.  Owner is responsible for all costs 

associated with fryer installation and start up unless prior arrangements have been made with Ultrafryer Systems.

 

DISCLAMIER OF WARRANTIES

Other than as stated herein ULTRAFRYER SYSTEMS makes no warranty of any kind, express or implied, including but not 

limited to any warranty of merchantability of fitness for a particular purpose, including trade usage. Ultrafryer Systems sole 

obligation, and purchaser’s sole remedy, under this warranty is repair or replacement, at the discretion of Ultrafryer Systems, of 

any part or component that proves to be defective in materials or workmanship. In no event shall Ultrafryer Systems be liable for 

consequential, incidental, or special loss or damages arising from the use of, or inability to use, the ULTRAFRYER®. This limited 

warranty is the only and complete statement with respect to warranties of NEW Ultrafryer® PAR-2, PAR-3 Gas and Electric 

ULTRAFRYERS® sold after March 1st, 2001. There are no other documents or oral statements for which Ultrafryer Systems will 

be responsible.  

2

Содержание ZRT3-H

Страница 1: ...r Lane P O Box 5369 San Antonio Texas 78201 800 525 8130 210 731 5000 Fax 210 731 5099 WARNING TO PRECLUDE THE POSSIBILITY OF SPONTANEOUS COMBUSTIBLE FILTER TUB FIRES SLUDGE AND CRUMBS MUST BE REMOVED...

Страница 2: ...nt Ultrafryer Systems for use by personnel who will operate a 14 or 18 Model ZRT3 H Gas Fryer equipped with an EZ Dock Filtration System TECHNICAL PUBLICATIONS DEPARTMENT ULTRAFRYER SYSTEMS 302 SPENCE...

Страница 3: ...on Electrical Connections Default To Manual Restart DTMR Control Optional Controls INITIAL START UP Cleaning Start up Lighting Instructions Sequence Of Ignition Burner Operation Test Shortening Instal...

Страница 4: ...1 Cooking Computer Filtering Shortening Filter Tub Assembly Installation Filtering Polishing Shortening Fryer Boil Out Shortening Disposal Shortening Installation TECHNICAL ASSISTANCE ORDERING INFORMA...

Страница 5: ...GENERAL INFORMATION 1...

Страница 6: ...fy an authorized service agent to make repairs during normal hours or after hours Any parts that need to be shipped back to Ultrafryer Systems will be shipped back prepaid by the customer marked with...

Страница 7: ...rs may request the fryer be equipped with an Ultrastat 21 or Ultrastat 25 Cooking Computer In addition the 14 18 Model ZRT3 H are equipped with the NEWLY developed EZ Dock Filtration System that uses...

Страница 8: ...14 MODEL ZRT3 H GAS FRYER 18 MODEL ZRT3 H GAS FRYER 14 18 MODEL ZRT3 H GAS FRYER CONTROL LOCATIONS 4...

Страница 9: ...previous page AUTOMATIC SAFETY FEATURES A High limit thermostat to shut off gas to the main burners by opening a solenoid actuated safety valve in the combination gas control valve B Combination gas...

Страница 10: ...ryer and main gas regulator locate the FT3 HR M3 HR of gas required for the fryer and pipe length and read the pipe diameter on the top row For example a 14 ZRT3 H fryer operating on NATURAL GAS requi...

Страница 11: ...when installed must conform to the current NFPA 54 1 and Canadian CAN CGA 1 11 latest edition NOTE Local building codes will usually not permit a fryer with its open tank of hot oil to be installed i...

Страница 12: ...R S COMBINATION GAS CONTROL VALVE EXCEEDS 1 2 lb in2 035 kg cm2 OR APPROXIMATELY 14 356 mm W C AN EXTERNAL REGULATOR MAY BE NEEDED TO PREVENT DAMAGE TO THE COMBINATION GAS VALVE AND VOIDING OF WARRANT...

Страница 13: ...START BUTTON When this button is momentarily depressed it places the fryer in operation RED STARTED LAMP When lit indicated the START BUTTON has been momentarily depressed and the fryer is operating A...

Страница 14: ...valve behind the fryer control access door of the fryer to the OFF position and wait FIVE 5 minutes for any accumulated gas to disperse 4 ENSURE the MAIN gas shut off is in the ON position MANUAL VAL...

Страница 15: ...pre set shortening cook temperature within 2 of the pre set temperature B START UP 1 TO TEST OPERATE an Ultrafryer Gas Fryer equipped with a Default to Manual Restart DTMR control a Ensure the fryer...

Страница 16: ...IT MELT key HEAt will appear in the computer display to indicate it is in the FULL ON mode 3 Depress the TEMP key ONCE The ACTUAL water temperature will be shown in the computer display NOTE DEPRESS T...

Страница 17: ...If shortening is needed use the filter scraper to cut off a small block of solid shortening 3 Place the small block of shortening into a fry basket lower the basket into the shortening then turn the...

Страница 18: ...ng handle skimmer to pull congealed shortening UPWARD from the Cold Zone area 6 When shortening has reached the set temperature and the RED indicator lamp on the fryer has turned OFF allow the Electro...

Страница 19: ...y have over heated and shut off on thermal over load If this situation did occur it will correct itself when the mo tor cools 10 20 minutes If this overheating problem persists re place the blower mot...

Страница 20: ...rtment at 1 800 525 8130 for technical assistance or to perform any maintenance or repair that may be necessary CLEANING Any item of equipment operates better and lasts longer when it is kept clean an...

Страница 21: ...t FINGER LOOP on FRAME B EVENLY pull the frames apart then HINGE FRAME A to remove it from the FILTER SCREENS FIRST c Grasp the FINGER LOOP on the straight side of FRAME B then HINGE it to remove FRAM...

Страница 22: ...re inserted in the other CHANNEL of FRAME B and the PIN on FRAME B is seated in the CHANNEL of FRAME A 9 Adjust FRAME A and B so other PINS are properly seated in the CHANNEL of the opposite frame the...

Страница 23: ...the OFF position and wait FIVE 5 minutes for any accumulated gas to disperse 3 ENSURE the MAIN gas shut off valve is in the ON posi tion and that the EXHAUST FAN is ON 4 Turn the MANUAL gas valve to t...

Страница 24: ...display ACTUAL TEMPERATURE when depressed ONCE Used to display SETPOINT TEMPERATURE when depressed TWICE Used to display remaining TIME when depressed THREE TIMES EXIT MELT 1 Used to manually exit the...

Страница 25: ...MP key THREE 3 times 4 Steps 1 2 3 and 4 will have to be repeated each time any of the following occurs DRAIN VALVE IS OPENED FRYER TOGGLE ON OFF SWITCH IS TURNED OFF TO FILTER SHORTENING OR BOILOUT A...

Страница 26: ...le sediment and debris on the heat exchanger and vat sides push in the Vat Shortening RETURN LEVER and procede to the following paragraph g below g An AUTOMATIC VAT CLEANER AVC Spray Blaster is an opt...

Страница 27: ...ENING INSTALLATION A GENERAL Shortening in the Model ZRT3 H Gas Fryer should be BOILED OUT every 7 DAYS to remove carbon buildup and other encrusted material B SHORTENING DISPOSAL 1 CAREFULLY assemble...

Страница 28: ...ilter tub C BOIL OUT Boil out the ZRT3 H Gas Fryer following the cleaning instructions in the Cleaning Manual provided by your approved chemical supplier The following are generic proceduress DTMR EQU...

Страница 29: ...E HANDLE to the closed UP position then fill the fryer with NEW shortening to the applicable shortening level mark as prescribed below 13 Reprogram the Ultrastat 11 Cooking Computer for the correct co...

Страница 30: ...nd will gladly assist you in preparing and processing of the necessary claims only if proper notification has been accomplished on the carrier delivery document Damaged equipment and or containers mus...

Страница 31: ...THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 32: ...27 ULTRAFRYER MOCEL ZRT3 H GAS FRYER FRONT VIEW 14 ZRT3 H 18 ZRT3 H...

Страница 33: ...Drain Ball Valve Assembly 19A564 17 Ignitor Spark Rod Assembly w Ignitor Rod Set Rod Gap to VVE 4mm prior to installation 19A738 18 Sound Weldment Baffle 19A739 19 Docking Release Handle 19A948 20 14...

Страница 34: ...8 High 146 x 208mm Rectangular Flue Tube with deflector 18 Model ZRT3 H 73 4 x 111z High 197 x 281mm Rectangular Flue Tube with deflector 19A910 19b312 7 125 Volt 75 Watt Silicon Heater 5 1524mm Long...

Страница 35: ...R Lens 23A056 6 COOKING CONTROLS Default To Manual Restart DTMR Control f 14 18 Model ZRT3 H Uses Electronic Thermostat PN 12B077 Ultrastat 11 Cooking Computer Uses Temperature Probe 18A006 12B014 22A...

Страница 36: ...edium Duty Caster 28A005 ITEM DESCRIPTION PN 1 6 1829mm Wash Down Hose w Fittings 12 54 2 Wash Down Hose Nozzle Assembly 12 675 3 Proximity Sensor Switch 18A060 4 Cool II Handle 22 734 5 1 2 13mm S S...

Страница 37: ...I Handle 22 734 3 1 2 13mm HH 2236 SQ Spray Nozzle 22A111 4 1 2 13mm x 90 Black Iron Elbow 24 007 5 1 2 13mm 5 Way Black Iron Crossover Manifold 24A082 6 14 ZRT3 H 1 2 13mm x 51 4 133mm Black Iron Nip...

Страница 38: ...33 15 0 WIRING DIAGRAM Since minor wiring changes may occur in the future USE the diagram pasted to the fryer for circuit tracing and or troubleshooting a Model ZRT3 H Gas Fryer...

Отзывы: