ULTRAFRYER ZRT3-H Скачать руководство пользователя страница 14

10

C.  ULTRASTAT 25 :  

The Ultrastat 25 Cooking Computer is a high perform-

 

ance, micro-processor based electronic controller designed for use in com- 

 

ercial appliance temperature and timing control applications.  Utilizing a 

 

microcontroller board, membrane switch front panel with a digital LED 

 

readout, and display board, the Ultrastat 25 Cooking Computer has been 

 

customized for Ultrafryer Systems applications by the addition of up to (10) 

 

stage cooking profiles for each of the (8) product keys, exit melt feature, 

 

optional temperature setback and filtering promps, and can be programmed 

 

to cook products under “Flex” or “Straight” timing modes.   Operation of the 

 

Ultrastat 25 Cooking Computer is covered in its Instruction Manual PN 

 

30A051 provided with Fryers Equipped with that computer.

INITIAL START-UP
 

A.  CLEANING:

  New units are wiped clean with solvents at the factory to remove any visible signs of dirt, oil, grease, etcetera, remaining 

 

 

from the manufacturing process, then given a light coat of oil.  Each fryer vessel should be thoroughly washed with hot soapy water to 

 

 

remove film residues, installation dust or debris; and then wiped dry before being used for food preparation.

 

B.  START-UP:

  The fryers are tested, adjusted and calibrated prior to being shipped: however adjustments may be necessary on installation to 

 

 

meet local conditions, high or low gas pressure, differences in altitudes, variations in gas characteristics and to correct possible problems 

 

 

caused by rough handling or vibration during shipment.  Initial calibration or adjustment is the responsibility of the customer and will not 

 

 

be covered bythe Ultrafryer Systems warranty.

 

NOTE:

  Calibration and adjustments must be performed by qualified personnel.

 

C.  LIGHTING INSTRUCTIONS:

  Each fryer is equipped with a spark ignition system and to test this system, perform the following steps, 

 

 

in sequence:

 

 

1.  Turn the Toggle 

ON/OFF SWITCH

 to the 

OFF

 position.

 

 

2.  Fill the fryer vessel  with hot or cold water to the 

SHORTENING LEVEL

 mark.

 

CAUTION :   IF THE MAIN BURNERS ARE OPERATED WITH THE VESSEL EMPTY, THE HEAT WILL CAUSE THE JOINTS OF THE 

 

 

FRYER VESSEL TO BE PLACED UNDER UNDO STRESS AND MAY CAUSE THE HEAT EXCHANGER VESSEL TO WARP OR  

 

 

BUCKLE, VOIDING WARRANTY.

 

 

3.  Turn the manual gas valve behind the fryer control access door of the fryer to the 

OFF

 position and wait 

FIVE

 (5) minutes for any

 

 

 

 accumulated gas to disperse.

 

 

4. 

ENSURE

 the 

MAIN

 gas shut-off is in the 

ON

 position, 

MANUAL VALVE

 on the combination 

GAS CONTROL VALVE

 (located 

 

 

 

behind the fryer control access door) is in the 

ON

 position and the 

EXHAUST FAN 

in 

ON.

 

 

5.  Turn the manual gas valve to the 

ON

 position.

 

 

6.  Turn the 

ON/OFF

 switch 

ON

; then place the

 DTMR 

or

 ULTRASTAT

 Cooking Computer into the 

MELT MODE

.

WARNING!!!       DO NOT USE A MATCH OR CANDLE TO LIGHT A FRYER…  EVER!

SEQUENCE OF IGNITION: 

When the lighting instruction steps are performed in the sequence listed above, the following will occur:

 

A.  Blower motor will come 

ON

 activating the air pressure switch.

 

B.  The air pressure switch will 

CLOSE

 completing the electrical circuit to the transformer.

 

C.  The transformer will supply 24 volts to the 

IGNITOR MODULE

 and 

GAS CONTROL VALVE

, and the ignitor will 

SPARK

 lighting 

 

 

the gas in the burner.  

WARNING!!!      WHEN CHECKING FOR BURNER PERFORMANCE,    DO NOT STAND WITH YOUR FACE CLOSE

 TO THE BURNER…. IT MAY LIGHT WITH A “POP” AND COULD FLASH BACK AND CAUSE FACIAL BURNS.

 

NOTES: 

 1)  If the burner flame fails, it will be sensed by the SPARK IGNITOR, the Spark Ignitor Module will open the electrical circuit to the

 

 

GAS CONTROL VALVE

 shutting off gas to the burner.  2)  If the blower motor fails, the air pressure switch will open the 

 

 

electrical circuit to the 

TRANSFORMER 

removing electrical power from the SPARK IGNITOR MODULE and GAS CONTROL VALVE 

 

 

shutting off gas to the burner.

BURNER OPERATION TEST:

  Perform above 

LIGHTING INSTRUCTIONS

 and observe operation of the burners.  When satisfied that the 

 

burner is operating properly, drain the fryer vessel of water and dry the vessel thoroughly; then fill the fryer vessel with shortening according to 

 

instruction below.

SHORTENING INSTALLATION:

 

A.  LIQUID SHORTENING:

 When using a liquid shortening cooking oil) fill the fryer with shortening even with the middle line of the 

“E     ”

 

 

 

in the word LEVEL of the applicable shortening level mark on he rear wall of the fryer.

 

B.  SOLID SHORTENING:

 

 

1)  Cut a block of solid shortening into small pieces.

 

 

2)  Place small pieces of solid shortening 

EVENLY

 on top of the 

HEAT EXCHANGER TUBES 

or 

THOROUGHLY PACK 

these 

 

 

 

pieces of solid shortening between, below and above the 

EAT EXCHANGER TUBES

.  While packing solid shortening is messy 

 

 

 

and time consuming, it is the fastest way to melt solid shortening.

Содержание ZRT3-H

Страница 1: ...r Lane P O Box 5369 San Antonio Texas 78201 800 525 8130 210 731 5000 Fax 210 731 5099 WARNING TO PRECLUDE THE POSSIBILITY OF SPONTANEOUS COMBUSTIBLE FILTER TUB FIRES SLUDGE AND CRUMBS MUST BE REMOVED...

Страница 2: ...nt Ultrafryer Systems for use by personnel who will operate a 14 or 18 Model ZRT3 H Gas Fryer equipped with an EZ Dock Filtration System TECHNICAL PUBLICATIONS DEPARTMENT ULTRAFRYER SYSTEMS 302 SPENCE...

Страница 3: ...on Electrical Connections Default To Manual Restart DTMR Control Optional Controls INITIAL START UP Cleaning Start up Lighting Instructions Sequence Of Ignition Burner Operation Test Shortening Instal...

Страница 4: ...1 Cooking Computer Filtering Shortening Filter Tub Assembly Installation Filtering Polishing Shortening Fryer Boil Out Shortening Disposal Shortening Installation TECHNICAL ASSISTANCE ORDERING INFORMA...

Страница 5: ...GENERAL INFORMATION 1...

Страница 6: ...fy an authorized service agent to make repairs during normal hours or after hours Any parts that need to be shipped back to Ultrafryer Systems will be shipped back prepaid by the customer marked with...

Страница 7: ...rs may request the fryer be equipped with an Ultrastat 21 or Ultrastat 25 Cooking Computer In addition the 14 18 Model ZRT3 H are equipped with the NEWLY developed EZ Dock Filtration System that uses...

Страница 8: ...14 MODEL ZRT3 H GAS FRYER 18 MODEL ZRT3 H GAS FRYER 14 18 MODEL ZRT3 H GAS FRYER CONTROL LOCATIONS 4...

Страница 9: ...previous page AUTOMATIC SAFETY FEATURES A High limit thermostat to shut off gas to the main burners by opening a solenoid actuated safety valve in the combination gas control valve B Combination gas...

Страница 10: ...ryer and main gas regulator locate the FT3 HR M3 HR of gas required for the fryer and pipe length and read the pipe diameter on the top row For example a 14 ZRT3 H fryer operating on NATURAL GAS requi...

Страница 11: ...when installed must conform to the current NFPA 54 1 and Canadian CAN CGA 1 11 latest edition NOTE Local building codes will usually not permit a fryer with its open tank of hot oil to be installed i...

Страница 12: ...R S COMBINATION GAS CONTROL VALVE EXCEEDS 1 2 lb in2 035 kg cm2 OR APPROXIMATELY 14 356 mm W C AN EXTERNAL REGULATOR MAY BE NEEDED TO PREVENT DAMAGE TO THE COMBINATION GAS VALVE AND VOIDING OF WARRANT...

Страница 13: ...START BUTTON When this button is momentarily depressed it places the fryer in operation RED STARTED LAMP When lit indicated the START BUTTON has been momentarily depressed and the fryer is operating A...

Страница 14: ...valve behind the fryer control access door of the fryer to the OFF position and wait FIVE 5 minutes for any accumulated gas to disperse 4 ENSURE the MAIN gas shut off is in the ON position MANUAL VAL...

Страница 15: ...pre set shortening cook temperature within 2 of the pre set temperature B START UP 1 TO TEST OPERATE an Ultrafryer Gas Fryer equipped with a Default to Manual Restart DTMR control a Ensure the fryer...

Страница 16: ...IT MELT key HEAt will appear in the computer display to indicate it is in the FULL ON mode 3 Depress the TEMP key ONCE The ACTUAL water temperature will be shown in the computer display NOTE DEPRESS T...

Страница 17: ...If shortening is needed use the filter scraper to cut off a small block of solid shortening 3 Place the small block of shortening into a fry basket lower the basket into the shortening then turn the...

Страница 18: ...ng handle skimmer to pull congealed shortening UPWARD from the Cold Zone area 6 When shortening has reached the set temperature and the RED indicator lamp on the fryer has turned OFF allow the Electro...

Страница 19: ...y have over heated and shut off on thermal over load If this situation did occur it will correct itself when the mo tor cools 10 20 minutes If this overheating problem persists re place the blower mot...

Страница 20: ...rtment at 1 800 525 8130 for technical assistance or to perform any maintenance or repair that may be necessary CLEANING Any item of equipment operates better and lasts longer when it is kept clean an...

Страница 21: ...t FINGER LOOP on FRAME B EVENLY pull the frames apart then HINGE FRAME A to remove it from the FILTER SCREENS FIRST c Grasp the FINGER LOOP on the straight side of FRAME B then HINGE it to remove FRAM...

Страница 22: ...re inserted in the other CHANNEL of FRAME B and the PIN on FRAME B is seated in the CHANNEL of FRAME A 9 Adjust FRAME A and B so other PINS are properly seated in the CHANNEL of the opposite frame the...

Страница 23: ...the OFF position and wait FIVE 5 minutes for any accumulated gas to disperse 3 ENSURE the MAIN gas shut off valve is in the ON posi tion and that the EXHAUST FAN is ON 4 Turn the MANUAL gas valve to t...

Страница 24: ...display ACTUAL TEMPERATURE when depressed ONCE Used to display SETPOINT TEMPERATURE when depressed TWICE Used to display remaining TIME when depressed THREE TIMES EXIT MELT 1 Used to manually exit the...

Страница 25: ...MP key THREE 3 times 4 Steps 1 2 3 and 4 will have to be repeated each time any of the following occurs DRAIN VALVE IS OPENED FRYER TOGGLE ON OFF SWITCH IS TURNED OFF TO FILTER SHORTENING OR BOILOUT A...

Страница 26: ...le sediment and debris on the heat exchanger and vat sides push in the Vat Shortening RETURN LEVER and procede to the following paragraph g below g An AUTOMATIC VAT CLEANER AVC Spray Blaster is an opt...

Страница 27: ...ENING INSTALLATION A GENERAL Shortening in the Model ZRT3 H Gas Fryer should be BOILED OUT every 7 DAYS to remove carbon buildup and other encrusted material B SHORTENING DISPOSAL 1 CAREFULLY assemble...

Страница 28: ...ilter tub C BOIL OUT Boil out the ZRT3 H Gas Fryer following the cleaning instructions in the Cleaning Manual provided by your approved chemical supplier The following are generic proceduress DTMR EQU...

Страница 29: ...E HANDLE to the closed UP position then fill the fryer with NEW shortening to the applicable shortening level mark as prescribed below 13 Reprogram the Ultrastat 11 Cooking Computer for the correct co...

Страница 30: ...nd will gladly assist you in preparing and processing of the necessary claims only if proper notification has been accomplished on the carrier delivery document Damaged equipment and or containers mus...

Страница 31: ...THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 32: ...27 ULTRAFRYER MOCEL ZRT3 H GAS FRYER FRONT VIEW 14 ZRT3 H 18 ZRT3 H...

Страница 33: ...Drain Ball Valve Assembly 19A564 17 Ignitor Spark Rod Assembly w Ignitor Rod Set Rod Gap to VVE 4mm prior to installation 19A738 18 Sound Weldment Baffle 19A739 19 Docking Release Handle 19A948 20 14...

Страница 34: ...8 High 146 x 208mm Rectangular Flue Tube with deflector 18 Model ZRT3 H 73 4 x 111z High 197 x 281mm Rectangular Flue Tube with deflector 19A910 19b312 7 125 Volt 75 Watt Silicon Heater 5 1524mm Long...

Страница 35: ...R Lens 23A056 6 COOKING CONTROLS Default To Manual Restart DTMR Control f 14 18 Model ZRT3 H Uses Electronic Thermostat PN 12B077 Ultrastat 11 Cooking Computer Uses Temperature Probe 18A006 12B014 22A...

Страница 36: ...edium Duty Caster 28A005 ITEM DESCRIPTION PN 1 6 1829mm Wash Down Hose w Fittings 12 54 2 Wash Down Hose Nozzle Assembly 12 675 3 Proximity Sensor Switch 18A060 4 Cool II Handle 22 734 5 1 2 13mm S S...

Страница 37: ...I Handle 22 734 3 1 2 13mm HH 2236 SQ Spray Nozzle 22A111 4 1 2 13mm x 90 Black Iron Elbow 24 007 5 1 2 13mm 5 Way Black Iron Crossover Manifold 24A082 6 14 ZRT3 H 1 2 13mm x 51 4 133mm Black Iron Nip...

Страница 38: ...33 15 0 WIRING DIAGRAM Since minor wiring changes may occur in the future USE the diagram pasted to the fryer for circuit tracing and or troubleshooting a Model ZRT3 H Gas Fryer...

Отзывы: