Electrical Installation:
Connect the supply cable to the panel using a suitable isolation switch protected by a fuse or MCB rated
at no more than 16 amps. The only connections required are the supply to the panel together with connection
of secondary pump(s) if applicable. When a secondary pump is supplied with the package, the pump control
cables are installed at the factory and clearly marked. They should be connected to the pump only after the
pump has been fitted to the pipe work. All other wiring is carried out at the factory. All wiring must be carried
out by suitably qualified personnel in line with current regulations.
Panel enclosure: IP 65 – takes 240 volts, or 415 volts if UKE-19
Controller: IP 54
Actuator: reduced to 24 Volts – cover IP41 rated
Pump terminal box: IP44 rating – takes full supply voltage from the control panel
Sensor: reduced to 24 volts – may be effected by moisture
Over heat stat: reduced to 24 volts – not designed for outside use as can rust internally.
Pipe-work Connections: - Fig 1: Connection location and function.