background image

 

 

 

CPBatMan080212

 

 

 

UNIVERSAL FLOW MONITORS, INC. 

DIMENSIONS 

 

 

 

 

 

 

 

 

Содержание CoolPoint CP2-V8

Страница 1: ...on and Operation Manual Vortex Shedding Flowmeters Series CP V8 Battery operated UNIVERSAL FLOW MONITORS INC 1755 East Nine Mile Road PO Box 249 Hazel Park MI 48030 0249 TEL 248 542 9635 FAX 248 398 4...

Страница 2: ...ABLE OF CONTENTS 1 PROPRIETARY NOTICE 2 USING THIS MANUAL 2 QUICK SET UP 3 INSTALLATION 4 GENERAL SPECIFICATIONS 5 OPERATION 6 APPLICATIONS 6 MODEL CODES 7 PRESSURE DROP CHARTS 7 DIMENSIONS 8 RMA NOTI...

Страница 3: ...oduction other than in connection with the installation operation and maintenance of the equipment described herein Universal Flow Monitors Inc reserves the right to change the information contained i...

Страница 4: ...IGURATION OF METER At start up display shows 1 888 8 8 showing that its digits are all functional 18888 8 8 Then model is shown CP6 1 0 Example Run mode achieved Flow rate displayed at 0 flow is 0 0 0...

Страница 5: ...stream of the meter as well as 5 pipe diameters downstream Isolation ball valves when used should be in the full open position Throttling valves should always be placed downstream of the meter A minim...

Страница 6: ...flow Flow Capacities 3 4 25 GPM 95 LPM 1 50 GPM 190 LPM 1 1 2 100 GPM 380 LPM 2 200 GPM 750 LPM Turndown Ratio max to min flow 10 1 standard Process Connections Female NPT with BSPP and BSPT optional...

Страница 7: ...low viscosity clean or dirty water like liquids that are compatible with brass PVDF and Viton Metered fluids should not include long fibers or a significant level of abrasive solids Should abrasive we...

Страница 8: ...7 CPBatMan080212 UNIVERSAL FLOW MONITORS INC MODEL CODES PRESSURE DROP CHARTS...

Страница 9: ...8 CPBatMan080212 UNIVERSAL FLOW MONITORS INC DIMENSIONS...

Страница 10: ...turned goods must be shipped prepaid or they will be rejected REPAIRABLE MATERIAL Written or verbal authorization to proceed with the repair under an assigned Purchase Order must be received within 30...

Страница 11: ...the customer If no disposition is received by UFM within 30 days the goods will be scrapped and the 90 00 evaluation fee will be billed WARRANTY RETURNS Warranty returns must be shipped prepaid to UFM...

Страница 12: ...11 CPBatMan080212 UNIVERSAL FLOW MONITORS INC RMA FORM...

Страница 13: ...ON WHETHER IN CONTRACT TORT OR OTHERWISE c Disclaimer of Other Warranties The express warranty in this Acknowledgment is in lieu of any other warranty express or implied Without limiting the foregoing...

Страница 14: ...packaging waste Nuclear material means source material special material or by product material Nuclear reactor means any apparatus designed or used to sustain nuclear fission in a self supporting chai...

Отзывы: