10
Heating Control H1
Chapter 2
| Commissioning
Initial commissioning in combination with the ubisys G1 and the ubisys Smart Home App:
1. Open the ubisys Smart Home App.
2. Tap on
Configuration -> Basic Configuration -> Open for new
devices
.
3. The Zigbee network is now open for about 4 minutes and your H1
heating controller can join the network.
Display
Button
Schraubring
Drehrad
Batterie-Schutzfolie
100 mm
55 mm
4. Remove the battery protection foil from your H1. The device will
now be supplied with power.
0°C
2021.09.30
00:00
5. After the battery protection foil has been removed, the device auto-
matically starts up and the ubisys logo appears on the display.
Содержание H1
Страница 1: ...Heating Control H1 Manual...
Страница 4: ...4 Heating Control H1 Chapter 1 General...
Страница 8: ...8 Heating Control H1 Chapter 2 Commissioning...
Страница 15: ...15 Heating Control H1 Chapter 3 Set Room Temperature...
Страница 20: ...20 Heating Control H1 Chapter 4 Schedules...
Страница 29: ...29 Heating Control H1 Chapter 5 More Functions and Information...