48
XI. SERVICE
DANGER
This boiler uses flammable gas, high voltage electricity, moving parts, and very hot water under high
pressure. Assure that all gas and electric power supplies are off and that the water temperature is cool
before attempting any disassembly or service.
Do not attempt any service work if gas is present in the air in the vicinity of the boiler. Never modify,
remove or tamper with any control device.
Important Product Safety Information
Refractory Ceramic Fiber Product
Warning
:
The Repair Parts list designates parts t
hat contain refractory ceramic fibers
(RCF). RCF has been classified as a possible human carcinogen. When
exposed to temperatures about 1805°F, such as during direct flame contact,
RCF changes into crystalline silica, a known carcinogen. When disturbed as a
result of servicing or repair, these substances become airbor
ne and, if inhaled,
may be hazardous to your health.
AVOID Breathing Fiber Particulates and Dust
Precautionary Measures
:
Do not remove or replace RCF parts or attempt any service or repair work
involving RCF without wearing the following protective gear:
1. A National Institute for Occupational Safety and Health (NIOSH)
approved respirator
2. Long sleeved, loose fitting clothing
3. Gloves
4. Eye Protection
• Take steps to assure adequate ventilation.
• Wash all exposed body areas gently with soap and water after contact.
• Wash work clothes separately from other laundry and rinse washing
machine after use to avoid contaminating other clothes.
• Discard used RCF components by sealing in an airtight plastic bag. RCF
and crystalline silica are not classified as hazardous wastes in the United
States and Canada.
First Aid Procedures
:
• If contact with eyes: Flush with water for at least 15 minutes. Seek
immediate medical attenti
on if irritation persists.
• If contact with skin: Wash affected area gently with soap and water.
Seek immediate medical attent
ion if irritation persists.
• If breathing difficulty develops: Leave the area and move to a location
with clean fresh air. Seek immediate medical attention if breathing
difficulties persist.
• Ingestion: Do not induce vomiting. Drink plenty of water. Seek
immediate medical attention.
Содержание PVG3
Страница 14: ...14 Figure 4 Horizontal Vent Installation III Venting continued...
Страница 16: ...16 Figure 7 Attic Offset Figure 6 Vertical Vent Installation III Venting continued...
Страница 23: ...23 Figure 14 Recommended Boiler Piping For Circulator Zoned Heating Systems IV Water Piping and Trim continued...
Страница 24: ...24 Figure 15 Recommended Water Piping for Zone Valve Zoned Heating Systems IV Water Piping and Trim continued...
Страница 29: ...29 Figure 17 Wiring Connection Diagram VI Electrical continued...
Страница 31: ...31 Figure 19 Circulator Zoned System Wiring Diagram VI Electrical continued...
Страница 32: ...32 Figure 20 Zone Valve Zoned System Wiring Schematic VI Electrical continued...
Страница 34: ...34 Figure 21 Modular Boiler Piping VII Modular Installation continued...
Страница 36: ...36 Figure 22 Operating Instructions VIII System Start up continued...
Страница 51: ...51 Figure 29 Flue and Burner Cleanout 1 Burner XI Service continued...
Страница 54: ...54 XII Repair Parts continued...
Страница 56: ...56 XII Repair Parts continued...
Страница 60: ...60 XII Repair Parts continued...
Страница 67: ...67 SERVICE RECORD DATE SERVICE PERFORMED...
Страница 68: ...68 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net...