X. TROUBLESHOOTING (continued)
5. Circulator is On, Blower is On but Boiler Fails to Start
Display / Status
Description
STA 10
Retry / Recycle
Delay
The Boiler is in “Retry Delay”:
- The burner failed to light (no flame signal). After a 5 minute delay, control will attempt to light the burner
again. There is no limit to the number of retries.
Recycle Delay
- The burner loses flame during running mode, “
STA 8
”. After a 10 second delay, control will attempt to
light the burner again. If the burner loses flame during running mode, “
STA 8
” during the next six
recycles, control will progress to a soft lockout.
StA 11
Pressure Switch
Failed to Open
Refer to Troubleshooting Section,
Err 2
for corrective action.
STA 12
Pressure Switch
Failed to Close
Refer to Troubleshooting Section,
Err
29 for corrective action.
STA 13
Soft Lockout
When a soft lockout occurs, boiler will shut down. Boiler automatically restarts once condition that caused
the lockout is corrected and the one-hour time delay is completed. Boiler can be restarted sooner than the
time delay by entering Adjustment Mode and selecting the reset button (see Adjustment Mode instructions)
or by cycling power. Soft Lockout is caused by one of the following:
-
Err 63
, Maximum Recycles Exceeded – The burner lost flame during running mode, “
STA 8
” six times
in a row. Refer to recommended corrective actions on next page to help determine the cause of the
problem.
-
Err 64
, Internal Failure, refer to Error code listing for recommended corrective action.
-
Err 23
, Flame sensed during post-purge (before gas valve signaled open). Check the gas valve for
proper operation. Replace gas valve is problem persists.
STA 14
Hard Lockout
When a hard lockout occurs boiler shuts down.
STA 16
Flame Out of Sequence
If flame is detected in pre-purge control goes to Flame Out of Sequence Before trial, “
Sta 16
” and
“
rr 23
” is reported. The control gives a flame 10 seconds to disappear. If flame goes away, control
resumes heating cycle from the beginning. If it doesn’t “
rr 23
” is cleared and “
rr 6
” is reported. When
flame is off control goes to Soft Lockout and “
rr 6
” is cleared. Check gas valve for proper operation.
Содержание PVG3
Страница 14: ...14 Figure 4 Horizontal Vent Installation III Venting continued...
Страница 16: ...16 Figure 7 Attic Offset Figure 6 Vertical Vent Installation III Venting continued...
Страница 23: ...23 Figure 14 Recommended Boiler Piping For Circulator Zoned Heating Systems IV Water Piping and Trim continued...
Страница 24: ...24 Figure 15 Recommended Water Piping for Zone Valve Zoned Heating Systems IV Water Piping and Trim continued...
Страница 29: ...29 Figure 17 Wiring Connection Diagram VI Electrical continued...
Страница 31: ...31 Figure 19 Circulator Zoned System Wiring Diagram VI Electrical continued...
Страница 32: ...32 Figure 20 Zone Valve Zoned System Wiring Schematic VI Electrical continued...
Страница 34: ...34 Figure 21 Modular Boiler Piping VII Modular Installation continued...
Страница 36: ...36 Figure 22 Operating Instructions VIII System Start up continued...
Страница 51: ...51 Figure 29 Flue and Burner Cleanout 1 Burner XI Service continued...
Страница 54: ...54 XII Repair Parts continued...
Страница 56: ...56 XII Repair Parts continued...
Страница 60: ...60 XII Repair Parts continued...
Страница 67: ...67 SERVICE RECORD DATE SERVICE PERFORMED...
Страница 68: ...68 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net...