16
gravity circulation of boiler water during the
operation of the cooling system.
d. If boiler is used with an Indirect-Fired Domestic
Water Heater, install the Indirect-Fired Domestic
Water Heater as a separate heating zone. Refer
to the Indirect-Fired Domestic Water Heater
Installation, Operating, and Service Instructions
for additional information.
e. A water boiler installed above radiation level
must be provided with a low water cutoff device
as part of the installation.
B
.
INSTALL SAFETy RELIEF VALVE. See Figures
5A or 5B and 8A or 8B. Safety Relief Valve must be
installed with spindle in the vertical position.
Installation of the relief valve must be consistent with
ANSI/ASME Boiler and Pressure Vessel Code, Section
IV.
WARNING
Installation is NOT complete unless a safety relief
valve is installed as shown in Figure 8A or 8B.
Safety (relief) valve discharge piping must be
piped near floor to eliminate potential of severe
burns. DO NOT pipe in any area where freezing
could occur. DO NOT install any shut-off valves,
plugs or caps.
IV. WATER PIPING AND TRIm (continued)
C.
INSTALL DRAIN VALVE in return piping. See
Figures 8A and 8B.
D
. OIL, GREASE, AND OTHER FOREIGN
MATERIALS which accumulate in new hot water and a
new or reworked system should be boiled out, and then
thoroughly flushed. A qualified water treatment
chemical specialist should be consulted for
recommendations regarding appropriate chemical
compounds and concentrations which are compatible
with local environmental regulations.
E.
AFTER THE BOILER AND SySTEM HAVE BEEN
CLEANED
and flushed, and before refilling the entire
system add appropriate water treatment chemicals, if
necessary, to bring the pH between 7 and 11.
Содержание LE DV Series
Страница 5: ...5 I General Information Figure 1A LEDV Packaged Water Boiler with Beckett AFII Burner ...
Страница 6: ...6 I General Information continued Figure 1B LEDV Packaged Water Boiler with Riello BF Burner ...
Страница 19: ...19 v venting continued Figure 11 Vent Installation Figure 12 Vent Connector Un Assembled ...
Страница 20: ...20 v venting continued Figure 13 Vent Connector Assembled Figure 14 Air Intake Installation ...
Страница 48: ...48 xiii Repair Parts continued Figure 29 LEDV Bare Boiler Assembly ...
Страница 50: ...50 xiii Repair Parts continued Figure 30 LEDV Boiler Jacket Insulation ...
Страница 55: ...55 xiii Repair Parts continued Figure 33 Vent Kit Repair Parts ...
Страница 60: ...60 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net ...