
136
Start-up Instructions for Natural Gas or LP
1. Confirm Alpine boiler size, type and installed
altitude prior to startup.
2. ALP399C or ALP500C LP conversion only:
Adjust throttle screw to preliminary setting per
Table S1.
3. Start boiler as described in boiler Installation
manual and lock boiler in high fire (See
Section IX. Start-up). If boiler does not light,
turn throttle screw in ¼ turn increments in a
counterclockwise direction until boiler fires. Do
not stop here, follow Steps 4-7.
4. Verify CO
2
is within range shown in Table S2
and CO air free is less than 200 ppm. If CO
2
and CO air free are within these limits, move
to Step 6 and check fan speed at high fire
operation only.
5. If CO
2
is outside the window outlined in Table
S2, adjust throttle screw such that the CO
2
falls
in this range while boiler is locked manually
in high fire. Turning throttle screw counter-
clockwise increases the CO
2
, while clockwise
rotation leans the mixture, reducing the CO
2
.
Once CO
2
is within the limits in Table S2,
check CO air free again to ensure it is below
200 ppm. If CO air free is above 200 ppm turn
throttle screw clockwise in ¼ increments until
CO air free is below 200 ppm, while ensuring
CO
2
remains in the range specified in Table S2.
If CO air free
is still above 200 ppm, reduce fan
speed in 100 rpm increments until CO air free
is less than 200 ppm.
Warning
asphyxiation Hazard. Offset screw is adjusted
at the factory. DO nOT touch the offset screw if
measured low fire CO
2
is within limits specified
in Table S2.
6. Lock boiler in low fire (see Section IX. System
Start-up). Verify CO
2
is within range shown in
Table S2 and CO air free is less than 200 ppm.
7. If low CO2 is too high, decrease CO2 by
turning offset screw counter-clockwise in less
than 1/8 turn increments and checking the CO
2
and CO air free after each adjustment. If boiler
is equipped with 2 gas valves, offset screw
adjustments must be done to both gas valves
equally and simultaneously. See Figure 50 for
location of offset screw. Verify CO air free is
less than 200 ppm.
appendix a - instructions for High altitude installations above 2000 ft.
(continued)
8. If low fire CO
2
is too low, increase CO
2
by
turning offset screw clockwise in less than
1/8 turn increments and checking the CO
2
and
CO air free after each adjustment. If boiler
is equipped with 2 gas valves, offset screw
adjustments must be done to both gas valves
equally and simultaneously. See Figure 50 for
location of offset screw. Verify CO air free is
less than 200 ppm.
9. Start boiler five times at the above settings
to ensure boiler lights off without delay and
without noise. Check CO
2
and CO air free to
ensure that the CO
2
is within the range specified
in Table S2 and CO air free is below 200 ppm.
Be sure to replace the screw cap in the vent
adapter when combustion testing is complete.
10. Verify that the gas inlet pressure is between
the following limits with all gas appliances
(including the converted boiler) both on and
off:
• Natural Gas: 4.0 - 14.0 inches w.c.
• LP Gas: 8.0 - 14.0 inches w.c.
If inlet pressure is not within limits, adjust
before performing high altitude setup
procedure.
11. Return boiler to Automatic Mode. Press
“Auto”.
Boiler Model
approximate Throttle Screw Turns
ALP399C
2¾
ALP500C
3
ALP600C
N/A - Factory LP Builds
ALP700C
ALP800C
Table S1: approximate Clockwise Throttle Screw
Turns for LP gas (Propane) Conversion
Figure 50: gas Valve Detail
Содержание Alpine ALP500C
Страница 14: ...14 III Pre Installation and Boiler Mounting H Boiler Stacking continued Figure 5 Boiler Stacking ...
Страница 48: ...48 VI Water Piping and Trim continued Figure 28 Near Boiler Piping Heating Only ...
Страница 60: ...60 Figure 37 PCB Locations for Field Wiring Figure 38 120 VAC Field Wiring VIII Electrical continued ...
Страница 62: ...62 Figure 40 Ladder Diagram VIII Electrical continued ...
Страница 63: ...63 VIII Electrical continued 2 Figure 41 Wiring Connections Diagram ...
Страница 67: ...67 VIII Electrical continued Figure 45 Boiler to Boiler Communication with Zone Control Circulator Panel ...
Страница 72: ...72 IX System Start up continued Figure 48 Operating Instructions ...
Страница 124: ...124 XIII Repair Parts continued ...
Страница 126: ...126 XIII Repair Parts continued ALP600C ALP700C and ALP800C ALP800C shown ...
Страница 130: ...130 XIII Repair Parts continued ...
Страница 133: ...133 XIII Repair Parts continued 10A 10B 10C 10D 10G ...
Страница 143: ...143 ...
Страница 144: ...144 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net ...