
12
iii. Pre-installation and Boiler Mounting
(continued)
H. Boiler Stacking
1. For installations with unusually high space heating
and/or domestic hot water heating loads, where
employing multiple boilers will offer the benefits of
greater operational efficiency, floor space savings
and boiler redundancy, boilers may be installed
stacked maximum one boiler on top of another.
Refer to Table 6 “Alpine Boiler Model Stacking
Combinations” for details.
Table 6: alpine Boiler Model Stacking
Combinations
Bottom
Boiler Model
Top Boiler Model
ALP399C
ALP399C
ALP500C
ALP399C or ALP500C
ALP600C
ALP399C, ALP500C or ALP600C
ALP700C
ALP399C, ALP500C, ALP600C or ALP700C
ALP800C
ALP399C, ALP500C, ALP600C, ALP700C or
ALP800C
2.
To field assemble individual Alpine boilers into a
stackable configuration, use the steps below:
a. Position the bottom boiler first. Refer to Sections
II “Unpacking Boiler” and III “Pre-Installation
& Boiler Mounting” of the manual for details.
Always position higher input boiler model as
bottom boiler.
b. Each Alpine boiler is factory packaged with
2 stacking boiler attachment brackets (P/N
101679-01) and the bracket mounting hardware
[six (6) self-drilling hex washer head plated #8
x ½” long screws, P/N 80860743]. Locate and
remove the brackets and the hardware. The
stacking boiler attachment bracket has three
7/32” diameter holes punched in a triangular
pattern. See Figure 5 “Boiler Stacking”.
c. Alpine boiler left and right side panels have a
series of dimples at panel top and bottom. These
dimples are positioning dimples for stacking
boiler attachment bracket mounting screws. Side
panel bottom positioning dimples are evenly
spaced from boiler front and back, while side
panel top positioning dimples follow specific
pattern to compensate for Alpine boiler model
variable depth.
d. Position the upper boiler on top of the bottom
boiler and align boiler front doors and sides flush
with each other.
• Place first stacking boiler attachment bracket
onto the upper boiler left side panel, at the
panel lower left corner and align bracket two
upper holes with corresponding side panel
lower dimples.
Figure 4: Clearances To Combustible and non-combustible Material
Содержание Alpine ALP500C
Страница 14: ...14 III Pre Installation and Boiler Mounting H Boiler Stacking continued Figure 5 Boiler Stacking ...
Страница 48: ...48 VI Water Piping and Trim continued Figure 28 Near Boiler Piping Heating Only ...
Страница 60: ...60 Figure 37 PCB Locations for Field Wiring Figure 38 120 VAC Field Wiring VIII Electrical continued ...
Страница 62: ...62 Figure 40 Ladder Diagram VIII Electrical continued ...
Страница 63: ...63 VIII Electrical continued 2 Figure 41 Wiring Connections Diagram ...
Страница 67: ...67 VIII Electrical continued Figure 45 Boiler to Boiler Communication with Zone Control Circulator Panel ...
Страница 72: ...72 IX System Start up continued Figure 48 Operating Instructions ...
Страница 124: ...124 XIII Repair Parts continued ...
Страница 126: ...126 XIII Repair Parts continued ALP600C ALP700C and ALP800C ALP800C shown ...
Страница 130: ...130 XIII Repair Parts continued ...
Страница 133: ...133 XIII Repair Parts continued 10A 10B 10C 10D 10G ...
Страница 143: ...143 ...
Страница 144: ...144 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net ...