62
103448-10- 6/18
VI. Water Piping and Trim
(continued)
2. Piping with a refrigeration system
-
If the
boiler is used in conjunction with a refrigeration
system, pipe the boiler and refrigeration
system in parallel. Use isolation valves to
prevent chilled medium from entering the
boiler.
3. Boiler Piping with Air Handlers
-
Boiler
connected to heating coils located in air
handling units with potential exposure to
refrigerated air circulation must be equipped
with flow control valves or other automatic
means to prevent gravity circulation of boiler
water during the cooling cycle.
Table 15: Multiple Boiler Water Manifold Sizing
Boiler Model
Number of Boilers
2
3
4
5
6
7
8
Recommended Minimum Common Water
Manifold Size (NPT)
ALP080B
1¼”
1½”
1½”
2”
2”
2”
2½”
ALP105B
1¼”
1½”
2”
2”
2½”
2½”
2½”
ALP150B
1½”
2”
2½”
3”
3”
3”
3”
ALP210B
2”
2½”
2½”
3”
3½”
3½”
3½”
ALP285B
2”
3”
3”
3½”
4”
4”
5”
D. Special Situation Installation Requirements
Observe the following guidelines when making the
actual installation of the boiler piping for special
situations:
1. Systems containing high level of dissolved
oxygen
–
Many hydronic systems contain
enough dissolved oxygen to cause severe
corrosion damage to Alpine boiler heat
exchanger. Some examples include but not
limited to:
•
Radiant systems employing tubing without
oxygen barrier
• Systems with routine additions of fresh
water
• Systems open to atmosphere
If the boiler is used in such a system, it must
be separated from oxygenated water being
heated with a heat exchanger as shown
in Figure 23. Consult the heat exchanger
manufacturer for proper heat exchanger sizing
as well as flow and temperature requirements.
All components on the oxygenated side of
the heat exchanger, such as the pump and
expansion tank, must be designed for use in
oxygenated water.
Figure 23: Isolation of the Boiler From Oxygenated Water with A Plate Heat Exchanger
Содержание Alpine ALP080B
Страница 76: ...76 103448 10 6 18 VIII Electrical continued...
Страница 77: ...103448 10 6 18 77 VIII Electrical continued Figure 27 Wiring Connection Diagram...
Страница 78: ...78 103448 10 6 18 Figure 28 Ladder Diagram VIII Electrical continued...
Страница 82: ...82 103448 10 6 18 VIII Electrical continued Figure 29D Boiler to Boiler Communication with Zone Panel...
Страница 146: ...146 103448 10 6 18...
Страница 147: ...103448 10 6 18 147...
Страница 148: ...148 103448 10 6 18 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net...