U-Line H-1459 Скачать руководство пользователя страница 8

PAGE 8 OF 8

HEATING ELEMENT REPLACEMENT

The heating element expands and contracts during 

each sealing cycle and will eventually break over 

time. Replace using only Uline heating elements.

Make sure that the machine is turned off 
and the power cord is secured before 
working on the machine. 

 

Any attempt to use elements designed 

for use on another machine or in another 
application may not work properly and 
may cause damage and/or create a 

dangerous situation. Use of non Uline parts 
will void all warranties.

Loosen the two clamp mounting screws and 

rotate  the  roller  knobs  to  rewind  the  Teflon

®

 

onto the roller to expose the heating element. 

(See Figure 9)

Remove the heating element retaining nuts at 

each end of the element (keep for reuse).

Remove  the  old  heating  element  and 

discard.

Inspect the insulator on the lower jaw for signs 

of cracks, pits, burn marks, etc.

If  the  insulation  material  is  worn  replace  it 

before  installing  the  new  heating  element. 

Remove  the  old  insulator  when  necessary, 

clean the area, apply a smooth coating of RTV 

adhesive,  install  the  replacement  insulation 

and  allow  it  to  dry  for  several  hours  before 

installing the new heating element.

NOTE: The heating element has a top 
and a bottom. See Figure 9 for proper 
positioning and installation. 

 

NOTE: The seal jaw assembly is spring-
loaded on left end, fixed on right end. 

 
 

.

2.

.

.

5.

Place the left end of the new heating element 

over the threaded post at the left end of the 

jaw assembly.

Compress  the  left  end  of  the  jaw  (spring-

loaded)  and  place  the  right  end  of  the 

heating element over the fixed threaded post 

on the right end.

Make  sure  that  the  heating  element  is 

positioned  correctly,  is  not  twisted  and  lays 

flat against the lower jaw.

Reinstall the retainer nuts no more than finger-

tight.

Reinstall the lower Teflon

®

 cover.

6.

7.

8.

9.

0.

HEATING ELEMENT INSTALLATION

TOP

SIDE VIEW - HEATING ELEMENT

RETAINER NUT

SPRING LOADED TERMINATION

RETAINER NUT

BROKEN ELEMENT

BARRIER STRIP

NEW ELEMENT

REMOVE OR ROLL UP
LOWER TEFLON ASSY.

PRIOR TO STARTING

1

2

3

USE A SMALL SCREW DRIVER
TO COMPRESS THE TENSION

SPRING DURING INSTALLATION

NOTE:

REPLACE TEFLON

COVER BEFORE USE

Figure 9: Replacing heating element

1-800-295-5510

uline.com

Содержание H-1459

Страница 1: ...ion and use of the machine Please enter the serial number of your machine in the space provided above If service in needed please be prepared to furnish both the model number and serial number UNPACK AND INSPECT Remove all packing materials from the machine Do not discard packing materials until you are sure there is no hidden damage Find the manual and related hardware supplied with the machine C...

Страница 2: ...crease cooling time Lower back panel Power Switch Push ON I push OFF O Other controls Foot Switch Step on to begin both the heat sealing and bag dispensing cycles Blower Air Flow Knob Top left side Adjusts airflow to open bags Pinch Roller Lever Right side Opens and closes pinch rollers Teflon Roller Adjustment Knobs Right and left sides Unroll or rewind the Teflon cover on the lower sealing jaw a...

Страница 3: ...ts being packaged are stored or manufactured for best workflow Also consider whether the operator will sit or stand while using this machine Place the unit on a level sturdy table that can support the weight of the machine the products to be packaged and those already packaged DESCRIPTION This self contained bag packaging machine dispenses opens and seals pre made pre opened bags from a roll The c...

Страница 4: ...ation pin remove the locking collar and one brake spring from the core shaft Slide a roll of bags on the shaft so that the pre opened parts of the bags face you Reinstall the brake spring and collar and place the roll of bags and the core assembly back in the machine Allow the core shaft to slide to the ends of the holding tracks Loosen the thumbscrews on the locking collars and center the roll of...

Страница 5: ...er sealer jaw using a left to right or right to left peeling motion INSPECTING THE HEAT SEAL An acceptable ribbon seal shows the grain of the Teflon jaw covers and have a slightly milky appearance An acceptable trim seal leaves a fine raised bead at the end of the bag no fringe or angel hair IF HEAT SEAL IS TOO WEAK Increase the heat time setting slightly clockwise If the heat seal does not look c...

Страница 6: ...each time IF BAG STOPS TOO HIGH ON THE MACHINE Increase the BAG LENGTH setting slightly clockwise Use the coarse or fine adjusting control as needed Flip the BAG ADJUSTMENT switch up or down until the next bag is in position for filling Fill tear off and heat seal the bag Repeat until the next bag stops in the proper position each time 2 2 MAINTENANCE if you encounter any problems with the Uline B...

Страница 7: ...elets and into the roller The screws should be snug Do not over tighten as damage could result Rotate the roller knob winding the Teflon cover onto the roller Insert the free end behind the clamp To reduce waste put as little Teflon beyond the end of the clamp as possible 2 replacing compression pad Over time the silicone rubber compression pad becomes brittle and pitted and needs to be replaced R...

Страница 8: ...lean the area apply a smooth coating of RTV adhesive install the replacement insulation and allow it to dry for several hours before installing the new heating element NOTE The heating element has a top and a bottom See Figure 9 for proper positioning and installation NOTE The seal jaw assembly is spring loaded on left end fixed on right end 2 5 Place the left end of the new heating element over t...

Отзывы: