U-Line H-1459 Скачать руководство пользователя страница 4

PAGE  OF 8

Set  the  sealer  control  for  the  material  to  be 

sealed. 

Dispense  the  first  bag  to  the  filling  position 

and air stream blows it open.

Place the product(s) into the open bag.

Tear off the filled bag at the perforations.

hold the bag flat and place the open mouth 

of  the  bag  between  the  open  sealing  jaws 

near the base of the machine.

Depress the electric foot switch.

CAUTION! DO NOT use the electric foot 

switch when liquids are on the floor. A 
dangerous electric shock might result.

The sealing jaws automatically close on the  

mouth of the filled bag.

The  automatic  sealing  cycle  begins  when 

the sealer jaws close fully and the next bag 

automatically  dispenses  into  the  air  stream 

and opens, ready for filling.

LOADING BAGS

The front access door is located under the pinch 

rollers. Pull handle to open door. 

If loading for the first time:

 Locate the core-

roll shaft packed for shipment at the factory in 

the top foam end cap.) Proceed to Step .

.

5.

6.

7.

8.

9.

5.

6.

1.

To change rolls

 (See Figure 2): Remove core- 

roll shaft from the holding brackets by pulling 

it toward you and slightly upward in  one fluid 

motion.  Note  that  one  end  of  the  core-roll 

shaft has a non-rotation pin.

Loosen the thumbscrew on the end opposite 

the non-rotation pin, remove the locking collar 

and one brake spring from the core shaft.

Slide a roll of bags on the shaft so that the    

pre-opened parts of the bags face you. 

Reinstall  the  brake  spring  and  collar  and 

place the roll of bags and the core assembly  

back in the machine. Allow the core shaft to 

slide to the ends of the holding tracks. 

Loosen  the  thumbscrews  on  the  locking 

collars and center the roll of bags on the core. 

Retighten  the  thumbscrews  so  there  is  slight 

pressure  from  the  brake  springs  against  the 

side plates on the roll of bags

NOTE: If the brake springs are over-
tightened, the perforations between 
the bags may separate while the bags 
are being dispensed. If the perforations 

break, it will require re-threading the bags 

through the pinch rollers. If the brake 
springs are too loose, the bags may unwind 
prematurely.

With  the  roll  of  bags  properly  placed  and 

centered  in  the  machine,  raise  the  lever  on 

the  right  side  of  the  machine.  This  releases 

pressure on the pinch rollers and allows easy 

bag threading. 

Insert  the  end  of  the  first  bag  from  the  roll 

between the pinch rollers. Make sure bag is 

centered with no wrinkles. (See Figure )

Pull  the  bag  between  the  rollers  to 

approximately  the  filling  position,  then  lower 

the  lever  on  the  left  side  of  the  machine  to 

close and lock the pinch rollers on the bag.

 
 
 
 
 

2.

.

.

5.

6.

7.

8.

9.

Non-rotate Pin

Bag Roll

Collar

Brake Springs

Shaft

Thumbscrew

Figure 2: Core-Roll Assembly

Содержание H-1459

Страница 1: ...ion and use of the machine Please enter the serial number of your machine in the space provided above If service in needed please be prepared to furnish both the model number and serial number UNPACK AND INSPECT Remove all packing materials from the machine Do not discard packing materials until you are sure there is no hidden damage Find the manual and related hardware supplied with the machine C...

Страница 2: ...crease cooling time Lower back panel Power Switch Push ON I push OFF O Other controls Foot Switch Step on to begin both the heat sealing and bag dispensing cycles Blower Air Flow Knob Top left side Adjusts airflow to open bags Pinch Roller Lever Right side Opens and closes pinch rollers Teflon Roller Adjustment Knobs Right and left sides Unroll or rewind the Teflon cover on the lower sealing jaw a...

Страница 3: ...ts being packaged are stored or manufactured for best workflow Also consider whether the operator will sit or stand while using this machine Place the unit on a level sturdy table that can support the weight of the machine the products to be packaged and those already packaged DESCRIPTION This self contained bag packaging machine dispenses opens and seals pre made pre opened bags from a roll The c...

Страница 4: ...ation pin remove the locking collar and one brake spring from the core shaft Slide a roll of bags on the shaft so that the pre opened parts of the bags face you Reinstall the brake spring and collar and place the roll of bags and the core assembly back in the machine Allow the core shaft to slide to the ends of the holding tracks Loosen the thumbscrews on the locking collars and center the roll of...

Страница 5: ...er sealer jaw using a left to right or right to left peeling motion INSPECTING THE HEAT SEAL An acceptable ribbon seal shows the grain of the Teflon jaw covers and have a slightly milky appearance An acceptable trim seal leaves a fine raised bead at the end of the bag no fringe or angel hair IF HEAT SEAL IS TOO WEAK Increase the heat time setting slightly clockwise If the heat seal does not look c...

Страница 6: ...each time IF BAG STOPS TOO HIGH ON THE MACHINE Increase the BAG LENGTH setting slightly clockwise Use the coarse or fine adjusting control as needed Flip the BAG ADJUSTMENT switch up or down until the next bag is in position for filling Fill tear off and heat seal the bag Repeat until the next bag stops in the proper position each time 2 2 MAINTENANCE if you encounter any problems with the Uline B...

Страница 7: ...elets and into the roller The screws should be snug Do not over tighten as damage could result Rotate the roller knob winding the Teflon cover onto the roller Insert the free end behind the clamp To reduce waste put as little Teflon beyond the end of the clamp as possible 2 replacing compression pad Over time the silicone rubber compression pad becomes brittle and pitted and needs to be replaced R...

Страница 8: ...lean the area apply a smooth coating of RTV adhesive install the replacement insulation and allow it to dry for several hours before installing the new heating element NOTE The heating element has a top and a bottom See Figure 9 for proper positioning and installation NOTE The seal jaw assembly is spring loaded on left end fixed on right end 2 5 Place the left end of the new heating element over t...

Отзывы: