Configuration Guide
Leviton Dimensions 4000 Series Architectural Lighting Controller
Page 14
OPERATION
SETUP
QUICK START
OV
ERVI
EW
CONFIGURATION
Devices with Channel Control only (D4200)
Setting up units with control and dimmers require a few basic
steps which when followed will ensure success of your lighting
control system:
Step 1:
Confirm all connections have been completed.
•
Network connections are required
•
Connection to adequate power supply is required
•
Lock/Occ input is an optional connection
Step 2:
Confirm network is terminated correctly, reference
installation guide for additional information.
Step 3:
Complete all “System Layout Charts” on page 68 to
confirm a clear understanding of all system and
configuration requirements.
Step 4:
Review “Navigating the Menus” on page 49
Step 5:
Power up unit
Step 6:
Perform “Power Up Initialization” on page 16 or review
“Setting the Network ID” on page 20
Step 7:
Perform setup of other network devices, dimmers, etc.
Step 8:
Confirm this device is patched to the correct channels.
Reference “To Assign Zones, consecutively, from a
Starting Channel Number:” on page 25.
Step 9:
Push the MAX button
•
CONFIRM that all loads controlled by this
device go to full. If they DO,
CONGRATULATIONS! You have made it a
long ways towards a successful
installation. If they DO NOT go to full,
please reference the troubleshooting
section on page 70 for additional
troubleshooting steps.
Step 10:
Slave any remote/entrance stations to this device.
(p.42)
Step 11:
Configure the clock - Set the date & time. See
“Configure the Clock” on page 52.
Step 12:
If scheduling events around sunrise or sunset, setup
the astronomical time clock on page 53.
Step 13:
Record your scenes, see “Recording a Scene” on
page 53.
Содержание D4006
Страница 40: ...Page 41 Remote To ID numbers unless already at zero 0 Assign Zones Exclusions Zones Zone Labels...
Страница 42: ...Page 43...
Страница 50: ...Page 51...
Страница 92: ......