TYROLIT Hydrostress FGE 400 Скачать руководство пользователя страница 12

7 Troubleshooting

EN Floor grinding machine FGE 400

12

7 Troubleshooting

Only suitably knowledgeable, qualified profes­

sional technicians may perform repairs on the

machine.

Malfunction

Cause

Rectification

Machine will not start.

The voltage supply has not been

properly connected.

Join the connecting cable (extension

cable) with the proper power socket

and plug the connection cable's coup­

ling in the power plug [2, Fig. A].

Connecting cable is defective.

Replace connecting cable.

Safety handle [12, Fig. B] is defec­

tive.

Repair or replace safety handle.

When using an extraction, the

suction housing sucks itself to

the floor.

Distance between rubber ring and the

surface to be ground is too little.

Correct the distance between rubber

lip and the surface to be ground

(

!

Chapter 3.1).

Grinding pattern is uneven.

Tools are loose.

Fasten tools.

Tools are damaged or worn.

Replace tools.

Machine shuts down by itself. Machine is overloaded.

The drive overload protection (MOP)

has triggered.

Select other tools if necessary

(

!

Chapter 4.4 ‐ page 9).

Reset:
a.

Disconnect the power plug

[2, Fig. A] from the mains.

b.

Wait 30 seconds.

c.

Restart the machine (

!

Chapter 3.1).

Connecting cable (extension cable) is

too long.

The minimum cross section and the

maximum length of the connecting

cable (extension cable)

!

Chapter 8

Faulty power supply.

Check the connecting cable

(extension cable) and replace if ne­

cessary.
Use a different power socket if ne­

cessary.

Drive motor is turning, but the

ETX locating plate is not tur­

ning.

Toothed belt is loose or torn.

Tighten or replace toothed belt.

Please contact the manufacturer.

Содержание FGE 400

Страница 1: ...1 10999140_en EN Floor grinding machine FGE 400 Translation of the original operating manual 4...

Страница 2: ...2 4 2 5 7 1 8 Fig A 3 6 9 Fig B 12 1 10 11 2 Fig C 13 13 17 Fig E 14 14 16 Fig D 15 Fig F 18 19 Fig G 3 Fig H 20 21 Fig J 22 6 5 1 8 9 7 4 23 Fig K Fig L 24 25...

Страница 3: ...3 Fig M Fig N Fig P Fig R...

Страница 4: ...3 Switching the machine off 8 4 Maintenance 9 4 1 Customer service and spare parts 9 4 2 Attaching Removing additional weights 9 4 3 Tilting the machine 9 4 4 Mounting and dismantling ETX diamond tool...

Страница 5: ...rried out inadequately or incorrectly Specified spare parts were not used The safety devices were not used have been altered or were removed The specified power supply ratings and surroun ding conditi...

Страница 6: ...ny defects are found in the machine that could endanger people or damage property stop the machine immediately and ensure that it cannot be used again until all repairs are com pleted Warning signs Fi...

Страница 7: ...3 1 Starting up the machine The initial start up of the machine may be car ried out only by qualified personnel A visual inspection of the machine needs to be carried out before starting up the machi...

Страница 8: ...started up Make sure that it is stan ding securely and that the guide handle is in the correct position When the machine is in operation do not touch any part of the machine outside the gripping range...

Страница 9: ...e over the bolts The removal is carried out in logical reverse order 4 3 Tilting the machine Before tilting the machine always make sure that it is on an even level floor surface 1 Disconnect the powe...

Страница 10: ...the machine The machine may only be transported if it has been switched off and the ETX locating plate is at a standstill Risk of injury from heavy loads Suspended loads can slide out of place fall o...

Страница 11: ...e g a pallet The grinding plate and the wheels must rest on the transport device d When transporting the machine with a ve hicle or suitable transport device always ensure that the machine is secured...

Страница 12: ...ittle Correct the distance between rubber lip and the surface to be ground Chapter 3 1 Grinding pattern is uneven Tools are loose Fasten tools Tools are damaged or worn Replace tools Machine shuts dow...

Страница 13: ...mm2 max 25 m 5 x min 4 0 mm2 25 m Tool speed 900 rpm Protection rating IP 23 Dust extraction 50 mm Dimensions L x W x H ca 650 x 450 x 750 mm Working width 400 mm ETX locating plate 400 mm Edge distan...

Страница 14: ...TYROLIT Hydrostress AG Witzbergstrasse 18 CH 8330 Pf ffikon ZH Switzerland Telefon 41 0 44 952 18 18 Telefax 41 0 44 952 18 00 URL www tyrolit com...

Отзывы: