5
1.4 Standard Parts List
This section describes the Transport TN27 B4987 package contents
and accessories. Open the box carefully and ensure that all
components are present and undamaged. The product should arrive
packaged as illustrated below.
1.4.1 Box
Contents
Component
Description
2U chassis, (4) hot-swap HDD bays
Tyan S4987-E system board
(pre-installed)
Air Duct
1 x slim ODD drive (pre-installed)
M1003
:
LED control board (pre-installed)
5
Chapter 1: Overview
Содержание Transport TN27 B4987
Страница 1: ...Transport TN27 B4987 Service Engineer s Manual ...
Страница 2: ......
Страница 17: ...8 Rail Kit Rail with Bracket x 2 Screw Sack Chapter 1 Overview 8 ...
Страница 31: ...22 1 6 6 System Block Diagram Chapter 1 Overview 22 ...
Страница 62: ...3 6 1 M1003 LED Control Board Features 53 Chapter 3 Replacing Pre Installed Components ...
Страница 127: ...The following diagrams may guide you how to install the InfiniBand Driver Welcome Screen License Agreement 118 ...
Страница 128: ...Registration Info Install Path SDP WSD Activation 119 ...
Страница 129: ...Complete Custom Components Selection Only SDP or WSD may be installed Not both Below SDK 120 ...
Страница 130: ...SDP WSD Activation The installer installs 3 types of devices InfiniBand Fabric HCA IPoIB Interface 121 ...