22
TBV123 / TBV123-AN and TBV118L / TBV118L-AN Rigging Manual
The following procedure shows how to build an array of TBV118L subwoofers by
adding them one at a time, up to a maximum of 2.
The system is flown using a TBV123-FB flybar that attaches to your lifting system.
The top TBV118L subwoofer connects to two mounting points on the flybar.
Each TBV118L subwoofer connects to the subwoofer above using the integral
mounting points and rigging pins. No tools are required.
!
!
WARNING
DO NOT EXCEED A TOTAL QUANTITY OF 2 TBV118L SUBWOOFERS FOR
1 TBV123-FB FLYBAR. FAILURE TO FOLLOW INSTRUCTIONS MAY CAUSE
PERMANENT INJURY OR DEATH.
4.0.5 Personnel
The following procedures shall be undertaken by experienced, certified,
qualified, and authorised personnel only. The procedures require the use of three
or more authorised persons.
Protective Headwear shall be worn
Protective Footwear shall be worn
Protective Gloves shall be worn
Protective Eyewear shall be worn
Practice Safe Lifting
Chapter 4: Assembling a TBV118L Array on a TBV123-FB Flybar
4.0.1 Required Components
Item
Quantity
TBV123-FB Flybar
1
TBV118L Subwoofer
2 (maximum)
4.0.2 Preparation
Use the EASE FOCUS II software application to design your system to suit the
venue. This will calculate which flybar mounting hole to attach your bow shackle.
4.0.3 Location
Move the first TBV118L subwoofer cabinet so it is sitting upright on a safe flat
surface, directly below the suspension point.
4.0.4 Measured Weights
Please see Section 2.3 Weights on Page 9, and refer to EASE Focus Rigging
Parameters when designing your system.
TBV123-FB Flybar Working Load Limit (WLL)
Item
Working Load Limit (WLL)
TBV123-FB
100 kg
220.5 lbs
Содержание TBV118L-AN
Страница 50: ......