SAFETY AND PREVENTION
3
561405 - IS19/07 - EN
35/87
3.5.5.2
Additional warnings
The machine must be adequately cleaned before any maintenance intervention.
Routine maintenance is the user’s responsibility. It must be carried out in adequately equipped workshops.
Extraordinary maintenance and any repairs must be carried out by authorised maintenance technicians, and
in adequately equipped workshops.
Extraordinary maintenance and any repairs of the endothermic engine must be performed by personnel
authorised by the engine Manufacturer.
Cordon off the area where the maintenance or repair is carried out; it must be evident (e.g. through warning
signs) that the machine is under maintenance and that it cannot be used normally.
Immediately replace the faulty components involved in the safety functions. These components must be
replaced by maintenance technicians authorised by the Manufacturer.
If it became necessary to neutralise the safety systems (interlocked fixed guards, safety switches, etc.),
restore them before reusing the machine.
If it is necessary to intervene under the machine, make sure that it is fixed and secured.
Disconnect the battery cut-out switch before any maintenance or repair (e.g. bonnet open) to prevent
unexpected start-ups.
Do not leave tools or other objects on the machine or inside it at the end of the interventions.
Only use original spare parts.
3.5.5.3
P.P.E. to be used
Содержание TB30
Страница 1: ...Serial number Year USE AND MAINTENANCE MANUAL TB30 IS19 07 561405 EN ORIGINAL ...
Страница 2: ......
Страница 5: ......
Страница 10: ...1 GENERAL INFORMATION 10 87 561405 IS19 07 EN 1 3 EC DECLARATION OF CONFORMITY FACSIMILE ...
Страница 13: ...GENERAL INFORMATION 1 561405 IS19 07 EN 13 87 ...
Страница 42: ...3 SAFETY AND PREVENTION 42 87 561405 IS19 07 EN ...
Страница 43: ...SAFETY AND PREVENTION 3 561405 IS19 07 EN 43 87 ...
Страница 52: ...4 TRANSPORT AND INSTALLATION 52 87 561405 IS19 07 EN 1 2 3 3 Connect the mortar conveyor piping 1 Fig 4 15 1 ...
Страница 53: ...TRANSPORT AND INSTALLATION 4 561405 IS19 07 EN 53 87 ...
Страница 56: ...5 USE AND OPERATION 56 87 561405 IS19 07 EN 5 2 INSTRUMENTS ON THE MACHINE ...
Страница 85: ...DEMOLITION 7 561405 IS19 07 EN 85 87 ...
Страница 87: ...TROUBLESHOOTING 8 561405 IS19 07 EN 87 87 ...