Status: 13.08.2019 

 

 

Translation of the original Installation and operating instructions nnn 

TÜNKERS Maschinenbau GmbH 

 

  

5

 

Transport, Assembly and Commissioning

 

 

WARNING 

Danger to persons and the Machine! 

 

Only qualified personnel should be tasked with assembly and commissioning. 

 

Keep unauthorised persons away from the work. 

 

Use personal protection equipment. 

 

The operator must always have a line of sight to the danger area. 

 

During assembly, conversion, maintenance and adjustment work, disconnect the 
energy supplies and make sure there is no residual energy in the system. 

 

 

5.1

 

Assembly 

Requirement: 

 

The system on which the Machine is to be mounted must be deenergised and depressurised. 

 

Machine is ready for assembly. 

 

Bolting material is available. 

Work steps: 

 

Fig. 5-1: Assembling the Machine 

 

 

NOTE 

Material damage due to incorrect screw lengths! 

Screws that are too long prevent correct fastening. 

 

1. 

Mount the Machine with four socket head bolts M8 x 1.25 to the holes (b) of the front or rear 
shoulder surface. 

2. 

Connect the compressed air supply between the pneumatic control and the connections (d, c). 

3. 

Connect the sensor set to the controller. 

The use of external throttle valves is recommended for fine adjustment of the clamping action 
speed. 

The Machine is ready for use. 

Содержание SDZ 40 F

Страница 1: ...eName T NKERS Maschinenbau GmbH KundeAdresse Am Rosenkothen 4 12 KundeOrt D 40880 Ratingen Ger many KundeTelefon 49 0 2102 4517 0 KundeLand Germany KundeFax 49 0 2102 4517 9999 KundeEmail info tuenker...

Страница 2: ...ingen Germany Tel 49 0 2102 4517 0 Fax 49 0 2102 4517 9999 Email info tuenkers de Internet www tuenkers dewww tuenkers de This Installation and operating instructions is intended for the operator of t...

Страница 3: ...stallation and operating instructions 8 2 2 General safety instructions 8 2 3 Safety instructions for operation 9 2 4 Safety instructions for setup maintenance servicing repair and troubleshooting 10...

Страница 4: ...stings of features in any order or an order that need not be strictly maintained are marked with a bullet Example Property A Property B Sub property of property B Order Steps that must be performed in...

Страница 5: ...aware work of staff at regular intervals follow legal requirements and rules at the site of the Machine 1 5 Training instructions Only deploy trained or instructed staff Clearly define staff responsib...

Страница 6: ...achine must not be operated until it has been installed in a Machine that com plies with the provisions of the pertinent Machinery Directive The incomplete Machine must be incorporated into a complete...

Страница 7: ...r General Terms of Sale and Delivery always apply These are available to the operator of the Machine on the conclusion of the contract at the latest Warranty and liability claims in the case of person...

Страница 8: ...en vironmental damage This signal word is also used for application instructions and other useful information 2 2 General safety instructions WARNING Risk to persons and the Machine Maintain all safet...

Страница 9: ...e endangered by these actions WARNING Danger due to the entire machine moving The Machine is mounted on e g a turntable Unintended movement of the turnta ble the complete machine can result in serious...

Страница 10: ...ls 2 4 Safety instructions for setup maintenance servicing repair and trou bleshooting WARNING Danger to persons and the Machine Only authorised specialists may set up and maintain the Machine and rem...

Страница 11: ...nections Tighten screw connections to the corresponding tightening torque Regularly check all screw connections Follow the maintenance schedules provided by third party manufacturers NOTE Material dam...

Страница 12: ...tion 2018 Emission sound pressure level LpAd 70 dB A Weight 2 kg Dimensions L x W x H approx 88mm x 50mm x 213mm Stroke 10 mm Tensile force 1000 N Pressing force 850 N Clamping range 0 6 mm Tolerance...

Страница 13: ...the clamping jaws b extend and clamp the component against the support Fig 4 1 1 Overview Retractable Locating and Expanding Pin SDZ 40 F Pos Designation Description a Centring mandrel Extends retrac...

Страница 14: ...no residual energy in the system 5 1 Assembly Requirement The system on which the Machine is to be mounted must be deenergised and depressurised Machine is ready for assembly Bolting material is avail...

Страница 15: ...le Locating and Expanding Pin SDZ 40 F The Machine doesn t have any controls The Machine is operated via the control of the complete system in which the Machine is used NOTE For information on operati...

Страница 16: ...life and increase the usability Only use materials consumables and auxiliary substances that have been recommended by the manu facturer Recommended lubricants are specified when required Never mix lub...

Страница 17: ...ments are difficult to move Blow out clamping segments with compressed air if necessary grease with Molykote BR2 Plus Spreading and centring mandrel worn or deformed Replace spreading and centring man...

Страница 18: ...nd safety requirements in line with appendix I of the machine directive have been applied and adhered to Annex I Article 1 1 2 1 1 3 1 1 5 1 3 1 1 3 2 1 3 3 1 3 4 1 5 4 1 5 8 1 6 1 1 6 3 1 7 1 1 7 3 u...

Отзывы: