help purge the air out faster.
Note: For a Gas Water heater you will want to run water through the loop until the
pressure gauge reads 15psi, not necessary for the electric gas heater.
8.
Now close both FILL PORTS #1 and #2
9.
Now open the ball valve that is between the 2 hose bibs to complete the flow of
water through the system.
Allow Pressure To Rise In System
1.
Look at the pressure gauge on the heater manifold and start to close the hose bib
on the left.
2.
Once the pressure reaches above 15-20 PSI, make sure both hose bibs fill ports are
closed. The system is now filled/primed.
3.
Turn off the sump pump.
Power On Heater and Recirculating Pump and check system for leaks
1.
If you haven't already, power on the circulating TACO pump.
2.
Turn on the heater disconnect and check the flow rate of the heater.
3.
(Hubbell Electric heater only) For 1-2 seconds, simultaneously press the up and
down arrow on the heater display.
Содержание AV30
Страница 4: ...AV30 PRE INSTALLATION REQUIREMENTS AV30 Pre Installation Requirements v 3 0 4 37 ...
Страница 5: ...AV30 PRE INSTALLATION REQUIREMENTS AV30 Pre Installation Requirements v 3 0 5 37 ...
Страница 15: ...AV30 PRE INSTALLATION REQUIREMENTS AV30 Pre Installation Requirements v 3 0 15 37 CHILLER INSTALLATION ...
Страница 25: ...AV30 PRE INSTALLATION REQUIREMENTS AV30 Pre Installation Requirements v 3 0 25 37 ...