![TruSteel AV30 Скачать руководство пользователя страница 16](http://html.mh-extra.com/html/trusteel/av30/av30_pre-installation_1177382016.webp)
AV30 PRE-INSTALLATION REQUIREMENTS | AV30 Pre-Installati on Requirements | v. 3.0
16 / 37
MODEL TaeEvoTECH
Air Cooled Chillers
The TAEevo range of air-cooled chillers are a packaged unit
designed for industrial applications. They are supplied with
hermetic scroll or reciprocating compressors and an
innovative finned pack evaporation inside the storage tank.
Technical Documents
Note: The installation instructions should be in the upper cabinet of the unit.
·
Installation Instructions (PDF) [2 MB]
·
Alarm Resets and Other Important Info (PDF) [5 MB]
Important Information
1. The chiller should be placed OUTSIDE of the facility, either on a roof, or a concrete
slab. If placed inside, proper HVAC ventilation is required. The
chiller CANNOT operate in a closed space; the unit dissipates a lot of heat. Please
contact MTA (Manufacturer) if you have any doubt of chiller placement.
2. The bypass manifold, provided by TruSteel, should be properly installed by a
plumber. Use plumbers dope AND plumbers tape.
3. The copper plumbing(Crimped or Push Connect – NO FLUX) will be run to the shark
bite side of the ball valves provided. The ball valves are mounted on a unistrut.
4. The chiller requires a
propylene glycol/water mixture
. Please refer to the
Installation Instructions to verify how much propolyene glycol your unit will require.
(Ratio is climate dependant)
5. Please note that the chiller IS NOT powered by the AutoVap30 Control Panel. The
chiller is not controlled by the AutoVap30. The AutoVap30 only monitors, not
Содержание AV30
Страница 4: ...AV30 PRE INSTALLATION REQUIREMENTS AV30 Pre Installation Requirements v 3 0 4 37 ...
Страница 5: ...AV30 PRE INSTALLATION REQUIREMENTS AV30 Pre Installation Requirements v 3 0 5 37 ...
Страница 15: ...AV30 PRE INSTALLATION REQUIREMENTS AV30 Pre Installation Requirements v 3 0 15 37 CHILLER INSTALLATION ...
Страница 25: ...AV30 PRE INSTALLATION REQUIREMENTS AV30 Pre Installation Requirements v 3 0 25 37 ...