AV30 PRE-INSTALLATION REQUIREMENTS | AV30 Pre-Installati on Requirements | v. 3.0
27 / 37
4.
Have someone go over to the AutoVap30 with the other container to bleed air out
of the system using the Air/water bleed valve .
5.
Find the preheater on the left side of the AV30. Look for the blue ball valve toward
the top.
6.
Place the collection container under the ball valve and open it
7.
Have the person at the heater manifold power on the sump pump and then open
the hose bib on the left side.
8.
This fills the preheater with water pushing air out along the way. Once all the air is
pushed out let water come out for a few seconds. ****Note: Make sure to keep the
barrel full of enough water at all times as to not push air back into the system.
9.
The person at the AutoVap will be releasing air and then catching the excess water
that comes out of the preheater. Once you start to see a steady flow of water
coming out of the preheater, close the ball valve and the person at the heater
manifold can close the hose bib fill port and unplug the sump pump.
10.
Now most of the air should be bled out of the left side of the heater manifold. Now
it's time to bleed the air out of the right side of the manifold.
Prepare To Fill Evaporator (Use Port #2)
1.
Take the garden hose and attach it to the hose bib on the right side (Fill Port #2) of
the heater manifold ball valve.
2.
Plug in the sump pump
3.
Open the hose bib on the right to fill the other side of the heater manifold.
Содержание AV30
Страница 4: ...AV30 PRE INSTALLATION REQUIREMENTS AV30 Pre Installation Requirements v 3 0 4 37 ...
Страница 5: ...AV30 PRE INSTALLATION REQUIREMENTS AV30 Pre Installation Requirements v 3 0 5 37 ...
Страница 15: ...AV30 PRE INSTALLATION REQUIREMENTS AV30 Pre Installation Requirements v 3 0 15 37 CHILLER INSTALLATION ...
Страница 25: ...AV30 PRE INSTALLATION REQUIREMENTS AV30 Pre Installation Requirements v 3 0 25 37 ...