AV30 PRE-INSTALLATION REQUIREMENTS | AV30 Pre-Installati on Requirements | v. 3.0
20 / 37
Make sure the jumper wire in the PLC is removed. Itʼs landed in ter24Q and +24R.
For the HMI to power up, ter24O and -24V must be landed in both the HMI and PLC panels.
Pull out the 2 the E-Stops to start the AutoVap. One is on the PLC cabinet and one is on the HMI.
If HMI powers up but does not display any data this means that PLC is not communicating with the
HMI. Check the ethernet cable connections and re-crimp each end if necessary.
Contact Aqua Sierra
For questions/concerns/troubleshooting the PLC or HMI, please call Aqua Sierra (located
in Pacific Standard Time)
Call: 530.823.3241
STAGE 5: ASSEMBLE AV30
STAGE 6: PRIME WATER HEATER & CHILLER
Before proceeding to fill the water heater and chiller, you must have the
RED
and
BLUE
hoses connected to the AV30.
In the image of the
AV30, locate the Cold
Out and Cold In. These
will be the BLUE hose
connections to/from
the chiller.
Cold In: From the chiller
Cold Out: Back to the
chiller
In the image of the
AV30, locate the Hot
Out and Hot In. These
will be the RED hose
connections to/from
the water heater.
Hot In: From the water
heater
Hot Out: Back to the
water heater
Содержание AV30
Страница 4: ...AV30 PRE INSTALLATION REQUIREMENTS AV30 Pre Installation Requirements v 3 0 4 37 ...
Страница 5: ...AV30 PRE INSTALLATION REQUIREMENTS AV30 Pre Installation Requirements v 3 0 5 37 ...
Страница 15: ...AV30 PRE INSTALLATION REQUIREMENTS AV30 Pre Installation Requirements v 3 0 15 37 CHILLER INSTALLATION ...
Страница 25: ...AV30 PRE INSTALLATION REQUIREMENTS AV30 Pre Installation Requirements v 3 0 25 37 ...