AV15 INSTALLATION MANUAL | TruSteel AutoVap15 Installation Instructions | v. 1.3
32 / 43
11.Connect Water Lines (Red and Blue Hose) using instructions on tables
below. Also use the diagram above for reference.
Use this table to understand the connections
Hot Water Heater Hose Connections [Red Hose]
From
Connect To
Hot Water Heater Out from Ball Valve
on Wall
Evaporator Hot In (Lower Port on
Evaporator - flood fills)
Evaporator Hot Out
Pre Heater Hot In (Flood Fill)
Pre Heater Hot Out
Residue Vessel Hot In
Residue Vessel Hot Out
Hot Water Return Ball Valve
Cold Water Line Connections (Chiller) [Blue Hose]
From
Connect To
Chiller Out from Ball Valve on Wall
Condenser Cold In (Lower Port on
Evaporator - flood fills)
Condenser Cold Out
Vessel Cold In (Flood Fill)
Vessel Cold Out
Cold Water Return Ball Valve Back to
Chiller
CHILLER FILL & STARTUP
SYSTEM REQUIREMENTS
Use this chart to determine your recommended propylene:water ratio. If you have any doubts,
please call MTA-USA.
The total volume of your water/glycol mixture is around 80 gallons total.
Propylene Glycol Relative to Freeze Point
Propylene Glycol
Solution (%)
0%
10%
20%
30%
40%
50%
60%
Temperature (F)
°
Freezing Point
32
°
26
°
18
°
7°
(-8)
°
(-29)°
(-55)°
FILL CHILLER
1. Premix your desired ratio of propylene glycol and water in a clean, 30 gal. reservoir.
2. Make sure all valves throughout the chilling lines are open before filling
Содержание AV15
Страница 21: ...AV15 INSTALLATION MANUAL TruSteel AutoVap15 Installation Instructions v 1 3 21 43 ...
Страница 23: ...AV15 INSTALLATION MANUAL TruSteel AutoVap15 Installation Instructions v 1 3 23 43 2 RECOVERYASSEMBLY ...
Страница 26: ...AV15 INSTALLATION MANUAL TruSteel AutoVap15 Installation Instructions v 1 3 26 43 ASSEMBLY ...
Страница 42: ...AV15 INSTALLATION MANUAL TruSteel AutoVap15 Installation Instructions v 1 3 42 43 ...