TC 2020R Installation
TR22.1 2020 Installation with SMC_July_03
84
63. Reconnect air lines to gripper air
cylinder and piston. Put the crank
arm on the piston back on.
Figure 186. Air lines and crank arm for the piston
64. Start up the machine. Jog Y-axis in
the + direction out of the machine.
Reset the clamp height. In the
Switch Elements, open the
workpiece clamps.
Figure 187. Open workpiece clamps
65. Turn off the hydraulics. Mount 2
rubber bushings to the 2 lower
holes on the lower rail buttress.
Figure 188. Rubber bushings