TC 2020R Installation
TR22.1 2020 Installation with SMC_July_03
31
73. Place cables inside the cable
guard.
74. Install the wire trough and route the
control cabinet cables through the
conduit on the J-frame to the
electrical cabinet.
Figure 75. J-frame
Figure 76. Conduit in J-Frame