TC 2020R Installation
TR22.1 2020 Installation with SMC_July_03
68
18. Lay base rails for the SMC:
precision rails toward the machine,
non-precision rails with notch to
back of the C-frame.
Figure 139. Non-precision rail for the SMC
19. Build a target pole with measuring
tape.
Figure 140. Transit pole with measuring tape
20. Set up the Transit starting with the
tripod.
Figure 141. Transit tripod