
5055.549-A
TN10 NA 080617-28
19
Warning: Under no circumstances is this heater to be installed in a makeshift or "temporary" manner. It
may be fired only after the following conditions have been met.
•
DO NOT CONNECT THIS UNIT TO A CHIMNEY FLUE SERVING ANOTHER APPLIANCE.
•
DO NOT INSTALL IN A SLEEPING ROOM.
THIS HEATER MUST BE INSTALLED WITH LISTED DOUBLE-WALL CONNECTOR. BOTH CHIMNEY
SYSTEM AND CONNECTOR MUST BE 6"(150mm) DIAMETER AND LISTED TO:
IN CANADA - ULC S-641 LISTED CONNECTOR AND ULC-S-629 LISTED CHIMNEY,
IN USA - UL-103 HT LISTED CONNECTOR AND CHIMNEY
•
Outside combustion air supply must be used for Mobile Home installations see "Combustion Air" on page
20
Mobile Home Clearances
Mobile Home Installation
Installation
Minimum chimney height from top of unit is 12' (3.66 m) or as per chimney manufacturers roof
clearances whichever is greater.
NOTE: Longer chimney lengths and different pitch flashings may be used. Install all components to the
connector or chimney manufacturer's installation requirements. Consult your chimney supplier for installation
advice.
Procedure:
Follow Installation procedures "Securing Bracket Installation:" on page 13 plus the following extra steps.
WARNING: THE STRUCTURAL INTEGRITY OF THE MOBILE HOME FLOOR, WALL AND CEILING/ROOF MUST BE MAINTAINED.
Note: See "Combustion Air" on page 20.
•
Attach stove to floor using two 1/4" x 1" or longer lag screws.
If installing a leg model, insert anchor tabs into slot on bottom of two rear legs and secure to floor with
1/4" x 1" or longer lag screws.
•
If installing the Optional Blower Kit the unit must be grounded to the mobile home.
13 1/4"
337mm
18 5/8"
473mm
8"
205mm
11 1/4"
286mm
6"
155mm
3"
76mm
3"
76mm
Double Wall Connector - Mobile Home
Figure 8: TN10 Mobile home clearances.
Содержание TN10
Страница 27: ...5055 549 A TN10 NA 080617 28 27...